• 100kVA Step Up All Copper Three Phase Dry Type Distribution Transformer
  • 100kVA Step Up All Copper Three Phase Dry Type Distribution Transformer
100kVA Step Up All Copper Three Phase Dry Type Distribution Transformer
discuss personally
Model
SC(B)-35KV-100KVA
SC(B-20KV-100KVA
SC(B)-10KV-100KVA
Basic info
Brand Vziman
Model NO. 100KVA Step Up All Copper Three Phase Dry Type Distribution Transformer
Rated capacity 100kVA
Voltage grade 35KV
Series SC(B)
Product Detail

Description:

  • Dry-type transformers rely on natural or forced air cooling to dissipate the heat generated during operation. Proper ventilation and airflow around the transformer are essential to prevent overheating and maintain optimal efficiency.

  • Dry-type transformers are less susceptible to environmental factors than oil-immersed transformers, but certain environmental conditions still need to be taken into account.

  • The installation site should have protection against exposure to moisture, dust, corrosive agents, or other contaminants that could potentially degrade the transformer's insulation and components.

  • In harsh environments, such as coastal areas or industrial settings, additional protection measures, such as weatherproof enclosures or specialized coatings, may be necessary.

  • Proper electrical connections, including the primary and secondary windings, as well as the grounding of the transformer, must be carried out according to relevant electrical codes and manufacturer's specifications.

Feature:


  • The magnetic core has a miter step joint to ensure optimum performance and minimum sound levels by using step lap technology.

  • Windings are cast under vacuum with epoxy resin. Transient analysis tests have been performed to verify the electrical stress distribution.

  • Air-cooling system adopts top-blowing cross flow fan, which has the characteristics of low noise, high wind pressure, beautiful look, etc.

  • Intelligent temperature controller improves the safety and reliability of the transformer.

  • Supply various Enclosure options in IP20, IP23, etc.


Parameter:

image.png

Installation Location:


  • Installed in places without fire, explosion hazard, serious pollution, chemical corrosion and cluster vibration, indoor or outdoor.

  • Supply Ability:500 Set/Sets per Month.

Customized Service:

  • E2 Environmental Class.

  • C2 Climate Class.

  • F1 Fire Resistance Class.

Product Advantages:

  •  Vacuum-Casting

  • Our product is manufactured with vacuum casting process using a metal pattern, producing a thick resin layer with a smooth surface.

  •  Partial Discharge Free

  • Lower partial discharge characteristics.

  • All units are subjected to partial discharge test.

  • Voltage that is twice that of the operating system is applied to ensure safety.

  • Partial discharge is less than 10 pC.

  •  Shop Test Items.

Routine test:

  • Routine test is a must test for all transformers in our workshop.

  • Type test (as requested).

  • Lightning impulse test.

  • Temperature-rise test.

  • Measurement of sound level.


What is a step-up all-copper three-phase dry-type distribution transformer?

Definitions and Characteristics:

  • Voltage Boosting: It means that a transformer converts the input low-voltage electrical energy into high-voltage electrical energy.

  • All-Copper: The windings of the transformer are all made of copper wires, which possess excellent electrical conductivity and mechanical strength.

  • Three-Phase: It indicates that the transformer has three independent windings and is applicable to three-phase alternating current systems.

  • Dry-Type: It means that the transformer does not use a liquid cooling medium (such as transformer oil), and usually adopts natural air cooling or forced air cooling.

Working Principle:

  • Input Voltage: The low-voltage power source is applied to the transformer through the primary winding.

  • Generating Magnetic Field: The current in the primary winding generates an alternating magnetic field in the iron core.

  • Transferring Magnetic Field: The alternating magnetic field is transferred to the secondary winding through the iron core.

  • Inducing Electromotive Force: The alternating magnetic field induces an electromotive force in the secondary winding, generating a high-voltage output voltage.

  • Output Voltage: The secondary winding outputs the required high-voltage electrical energy for the load to use.


Know your supplier
Vziman
Zhejiang Vziman Electric Group Co., Ltd. is a high-tech enterprise specializing in R&D, manufacturing, and service of power electrical equipment. Committed to innovation, quality, and customer satisfaction, it supplies smart solutions for global power sectors, covering grid construction, new energy, and industrial distribution. Core Business • Switchgear (GIS, circuit breakers, Recloser, Load break switch) • Distribution equipment (transformers, RMU, smart terminals) • Power automation systems • Engineering services (installation, maintenance, consulting) Technical Strength • Provincial R&D center, multiple patents • Modern production, ISO/GB/IEC/CE/UL certified • High capacity, large-scale delivery support Market & Vision Serves State Grid, Southern Grid, and global projects (Asia, Africa, Europe, etc.). Aims to lead in smart grids and new energy, promoting sustainable energy development.
Main Categories
High voltage
Business Type
Design/Manufacture/Sales
Highest Annual Export (USD)
$150000000
Professional Experience
3 years
Workplace
10000m²
占位
占位
Related Products
Related Knowledges
What are the troubleshooting methods for current transformers?
What are the troubleshooting methods for current transformers?
As a front - line fault maintenance worker, I deal with current transformers (CTs) daily. A CT’s secondary winding in operation must never open - circuit! Once open - circuited, the secondary current and demagnetizing potential vanish. All primary - side magnetic potential then becomes the iron core’s exciting potential, sharply increasing its magnetic flux density. High voltage on the secondary side will endanger safety anytime.Despite strict power operation regulations, user electr
Felix Spark
07/04/2025
What are the criteria for selection of distribution transformer?
What are the criteria for selection of distribution transformer?
Transformer Selection Criteria: Essential Factors for Optimal PerformanceSelecting the appropriate transformer is critical for ensuring power distribution reliability across industrial, commercial, and residential systems. This process requires meticulous evaluation of load dynamics, environmental constraints, and regulatory standards. Below we outline key selection criteria to guide engineers and designers in making informed decisions.1. Maximum Demand AssessmentThe transformer’s capacity (kVA)
Master Electrician
07/03/2025
What are the causes of current transformer faults and the countermeasures for faults?
What are the causes of current transformer faults and the countermeasures for faults?
As a front - line maintenance technician, I deal with current transformers (CTs) daily. CTs convert high - magnitude primary current to low - magnitude secondary current for substation/line protection and measurement, operating in series long - term. However, they face faults from external (unbalanced loads, wrong wiring, etc.) and internal (insulation defects) issues. These faults, like secondary open - circuits or insulation breakdown, harm measurement accuracy, protection operation, and grid
Felix Spark
07/03/2025
Testing of Optical Current Transformers (OCT)
Testing of Optical Current Transformers (OCT)
With the development of modern economy and science and technology, photoelectric current transformers (PECTs) have fully transitioned from the trial operation stage to practical application. As a front - line testing personnel, I deeply feel their importance in the power system during daily work. I also realize the necessity of conducting in - depth research on their testing systems and calibration methods. This not only promotes the engineering application of PECTs but also enables the accurate
Oliver Watts
07/03/2025
Impact Analysis of Voltage Transformer Installation on Line Side vs. Load Side of Power Inlet Circuit Breaker for (ATS)
Impact Analysis of Voltage Transformer Installation on Line Side vs. Load Side of Power Inlet Circuit Breaker for (ATS)
Automatic backup switching (ABTS) devices are core components ensuring the safe, reliable, and stable operation of factory power grids. Their startup logic strictly follows the dual criteria of "loss of voltage in the working power supply + no - current detection", effectively avoiding misjudgments caused by secondary disconnection of voltage transformers (VTs) or maloperations of ABTS due to secondary circuit faults of current transformers (CTs). The activation condition requires both "no volta
James
07/03/2025
What tests need to be done on voltage transformers?
What tests need to be done on voltage transformers?
Practical Experience Sharing from an Electrical Engineer in the FieldBy Oliver, 8 Years in the Electrical IndustryHi everyone, I'm Oliver, and I've been working in the electrical industry for 8 years.From early involvement in substation commissioning and equipment inspection, to now managing the maintenance and fault analysis of entire power systems, one of the most frequently encountered devices in my work has been the voltage transformer (VT / PT).Recently, a friend who's just starting out ask
Oliver Watts
07/03/2025
×
Inquiry
Download
Experts Electrical is dedicated to serving the personnel in the global power industry.
Join Experts Electrical, not only can you discover power equipment and power knowledge, but also canhnd like - minded friends!