• LB Oil immersed hair pin current transformer
  • LB Oil immersed hair pin current transformer
LB Oil immersed hair pin current transformer
discuss personally
Model
LB6-40.5
Basic info
Brand Wone
Model NO. LB Oil immersed hair pin current transformer
Rated voltage 40.5kV
Series LB
Product Detail

Product introduction:
LB series current transformers are oil impregnated paper insulated, vertical structure to meet the IEC/IEEE stan dard. The series connected transformer in the line has the functions of electric energy measurement, metering, relay protection and transient protection.
Product features:
●LB series current transformers are of oil immersed fully sealed insulation structure. The primary winding is U type. The body is fixed at the bottom of the box. The main insulation is capacitive oil paper insulation, which is wrapped around the primary winding with high-voltage cable paper. Several capacitance screens are set between them. The inner screen is connected to the high potential, and the outer screen can be grounded.
●The upper part of the oil tank is equipped with a porcelain bushing. The primary outlet terminal is on the top of the porcelain bushing. The series and parallel connection are external exchange devices, that is, they can be exchanged outside the porcelain bushing.
●The stainless steel expander is used as the oil compensation device to ensure the oil quality. The oil level indica tion of the product is indicated by the eye-catching displacement indication of the upper window of the expander.
●The product can be equipped with 4-6 secondary windings. The secondary measurement windings made of microcrystalline alloys with high magnetic conductivity can ensure the measurement accuracy to reach class 0.2 or 0.2S × The secondary winding of 600A and above current transformer measurement level has taps to achieve two current ratios.
●The secondary terminal box is cast with aluminum alloy as a whole, with a dust-proof, waterproof and breathable sealing structure
●The connection between product parts adopts argon arc welding, and the whole assembly is filled with high-pressure nitrogen for leak detection, which fundamentally solves the problem of oil leakage of oil immersed products.
●The shell, base and junction box are all made of aluminum alloy. The expander and nameplate are made of stainless steel. All exposed parts will never rust.
●The product is maintenance free.
LB Oil immersed hair pin current transformer-2.png

LB Oil immersed hair pin current transformer-3.png

Remark: Approximate dimensions and weights for special requirements, please consult us.

Know your supplier
Wone
Main Categories
High voltage/Low voltage/Wire cable/Instrument meters/New energy/Tester/Production equipment/Generator/Electrical fittings/Integrated Electrical Equipment
Business Type
Design/Manufacture/Sales
Highest Annual Export (USD)
$50,000,000
Professional Experience
1 years
Workplace
65666m²m²
占位
占位
Related Products
Related Knowledges
Modular Intelligent Substation - Prefabricated Secondary Switchgear Integration Assembly
Modular Intelligent Substation - Prefabricated Secondary Switchgear Integration Assembly
With the development of the national economy and society, the requirements for the quality and craftsmanship of power grid projects have become increasingly stringent. The need to improve the construction progress and quality of substations has created opportunities for the promotion of prefabricated cabin - type intelligent substations. The traditional on - site wiring and commissioning of secondary substation equipment involve a large amount of work. Moreover, on - site construction has to wai
Echo
06/13/2025
Application of Pre-integrated Prefabricated Substations in Renewable Energy Sector
Application of Pre-integrated Prefabricated Substations in Renewable Energy Sector
Against the backdrop of profound changes in the global energy landscape and the booming development of the new energy industry, the construction mode of traditional substations struggles to meet the rapid deployment needs of new energy projects. The modular intelligent prefabricated cabin substation, leveraging its innovative advantages, has become a key direction for optimizing the new energy power system. In - depth exploration of its technical principles, industry adaptability, and applicatio
Echo
06/13/2025
Research on Reliability Enhancement Scheme Implementation for Modular Intelligent Prefabricated Substations
Research on Reliability Enhancement Scheme Implementation for Modular Intelligent Prefabricated Substations
1 Implementation Strategies for the Scheme1.1 Deepen Survey and ResearchBefore constructing prefabricated cabin - type substations, it is necessary to conduct detailed surveys of local working conditions, clarify the construction scale and objectives, evaluate existing power facilities, plan projects, make up for infrastructure shortcomings, and adjust the construction rhythm. Meanwhile, control costs to avoid project suspension.1.2 Strengthen Structural ConstructionDuring promotion, multi - dim
Echo
06/13/2025
Comparative Analysis of 500 kV Prefabricated Substations vs. Conventional Substations
Comparative Analysis of 500 kV Prefabricated Substations vs. Conventional Substations
The secondary equipment area of conventional substations uses reinforced concrete or prefabricated steel structures, facing issues like long construction cycles, unreasonable functional zone design, strict environmental assessments, dust, noise, and disturbances. Primary and secondary equipment can only be installed after civil works and decoration, lowering construction efficiency.Prefabricated cabin substations integrate modularity, intelligence, and cost - effectiveness, boasting green, energ
Dyson
06/13/2025
Operational Analysis of Prefabricated Enclosure Substations in Extreme Cold Climate Applications
Operational Analysis of Prefabricated Enclosure Substations in Extreme Cold Climate Applications
Under global climate diversity, alpine power construction faces technical and environmental challenges. Extreme climates, complex geology, and long - term low winter temperatures, along with ice, snow, and storms, strain electrical equipment stability and power facility construction (schedule, cost, maintenance). Traditional on - site substations, with long construction and poor adaptability, can’t meet alpine regions’ fast, stable power needs.Prefabricated cabin substations, as modu
Echo
06/13/2025
Implementation of Precast Foundations for Ring-Main Unit Compact Substations in Grid Modernization Initiatives
Implementation of Precast Foundations for Ring-Main Unit Compact Substations in Grid Modernization Initiatives
Compact substation boxes, with advantages like safe operation, high reliability, and easy maintenance, are used in urban grid construction/renovation. Structurally divided into American - style (high - cost, noisy, low - efficiency, gradually phased out) and European - style (large - sized but more advantages, still popular).To address their pros/cons, ring - network prefabricated ones were developed.I. Basic Materials for Prefabricated Compact Substation BoxesMaterials need hardness, strength,
Echo
06/13/2025
×
Inquiry
Download
Experts Electrical is dedicated to serving the personnel in the global power industry.
Join Experts Electrical, not only can you discover power equipment and power knowledge, but also canhnd like - minded friends!
商品视频播放