• Complete Set of Electric Brake Switch for 120kA Hydro-turbine Generating Units
Complete Set of Electric Brake Switch for 120kA Hydro-turbine Generating Units
discuss personally
Model
ZHN10-24 /15000-100
Basic info
Brand ROCKWILL
Model NO. Complete Set of Electric Brake Switch for 120kA Hydro-turbine Generating Units
Rated voltage 24kV
Rated normal current 15000
Series Circuit Breaker
Product Detail

Description:

This product is an essential switch equipment for achieving rapid shutdown of large hydroelectric generators. In 2019, it was appraised by the National Energy Administration and its comprehensive technical performance is at the leading domestic and international level. Currently, it has supplied 28 products to the Wudongde and Baihetan hydropower stations.

Product Performance:

  • High braking performance parameters: it has the capacity of braking current 30,000A and braking time 50 minutes.

  • High mechanical reliability: the brake switch and earthing switch can meet the mechanical life requirements of operation for 10,000 times.

  • Strong making capacity: the brake switch successfully passed the load current breaking and making test, and the current is 28,000A.

  • Reliable safety protection measures: pressure release device is installed at the top of the brake switch. When the gas pressure in the arc extinguishing chamber exceeds 1.2 MPa due to an accident, the gas will be released to ensure the safety of the personnel and surrounding equipment, The product design can ensure the stable operation of the power plant.

Product Structure:
微信图片_20240615104853_修复后.png

  • Product consists of three single poles, and each pole has an individual enclosed metal enclosure mounted on the same chassis.

  • Brake switch is equipped with hydraulic spring operating mechanism; earthing switch is equipped with a motor operating mechanism; the driving modes are all three-phase mechanical linkage.

  • The main circuit adopts natural cooling.

  • Each operating mechanism is installed on the side of the product close to the control cabinet.

  • SF6 is used as insulation and arc-extinguishing medium for brake switch, The arc-striking contact adopts ablation-resistant copper-tungsten material, which effectively improves the reliability and electrical life of the brake switch.

  • The earthing switch takes air as insulation medium, the fixed contact is installed on the support of the main circuit, the moving side is installed on the bottom plate of the box body, and the moving contact is connected with the single phase enclosure and forms the earthing circuit through the closed bus bar connected with the moving contact.

  • The overall structure of brake switch is compact and convenient for installation and maintenance on site.

Typical applications:
微信图片_20240615104935_修复后.png
微信图片_20240615104912_修复后.png
 Main technical parameters:

image.png

What is the standard for the opening time and opening time of the generator circuit breaker?

The opening and closing times for generator circuit breakers do not have a single fixed standard. The specific standards vary depending on the type of circuit breaker, voltage level, application scenario, and relevant standards and regulations. Below is a detailed introduction to the relevant standards:

Closing Time (Making Time):

  • Standard Range: Generally, the closing time for generator circuit breakers is typically between a few tens of milliseconds to over one hundred milliseconds. For example, common medium-voltage generator circuit breakers may have a closing time in the range of 30ms to 80ms, while high-voltage, high-capacity generator circuit breakers may have slightly longer closing times, but generally within 100ms.

  • Relevant Standards: According to relevant standards, the three-phase asynchronism closing time for generator circuit breakers should not exceed 5ms.

Opening Time (Breaking Time):

  • Standard Range: The opening time is the sum of the closing time and the arc burning time. The value can vary based on multiple factors. Generally, for medium-voltage generator circuit breakers, the opening time may be around 50ms to 150ms, while for high-voltage, high-capacity generator circuit breakers, the opening time may be around 100ms to 250ms.

  • Relevant Standards: For different voltage levels and types of generator circuit breakers, the transient recovery voltage during the interruption of short-circuit currents, load currents, and out-of-step currents should meet the corresponding standard requirements. The first-pole factor and magnitude factor can be taken as 1.5.


Know your supplier
ROCKWILL
Rockwill Electric Group Global Manufacturer of High voltage and medium-voltage power equipment and smart grid solutions. Headquartered in Wenzhou, China. Serving 100+ countries with quality, innovation, and trust. What We Offer: • HV-MV switchgear (VCB, SF₆ circuit breakers, RMU, GIS) • Distribution transformers and substations • Smart grid and monitoring systems • Solar, wind, EV charging, and energy storage solutions • EPC turnkey power projects Certified: ISO 9001 / ISO 14001 / ISO 45001
Main Categories
High voltage
Business Type
Design/Manufacture/Sales
Highest Annual Export (USD)
$150,000,000
Professional Experience
16 years
Workplace
108000m²m²
占位
占位
Related Products
Related Knowledges
Application of Pre-integrated Prefabricated Substations in Renewable Energy Sector
Application of Pre-integrated Prefabricated Substations in Renewable Energy Sector
Against the backdrop of profound changes in the global energy landscape and the booming development of the new energy industry, the construction mode of traditional substations struggles to meet the rapid deployment needs of new energy projects. The modular intelligent prefabricated cabin substation, leveraging its innovative advantages, has become a key direction for optimizing the new energy power system. In - depth exploration of its technical principles, industry adaptability, and applicatio
Echo
06/13/2025
Research on Reliability Enhancement Scheme Implementation for Modular Intelligent Prefabricated Substations
Research on Reliability Enhancement Scheme Implementation for Modular Intelligent Prefabricated Substations
1 Implementation Strategies for the Scheme1.1 Deepen Survey and ResearchBefore constructing prefabricated cabin - type substations, it is necessary to conduct detailed surveys of local working conditions, clarify the construction scale and objectives, evaluate existing power facilities, plan projects, make up for infrastructure shortcomings, and adjust the construction rhythm. Meanwhile, control costs to avoid project suspension.1.2 Strengthen Structural ConstructionDuring promotion, multi - dim
Echo
06/13/2025
Comparative Analysis of 500 kV Prefabricated Substations vs. Conventional Substations
Comparative Analysis of 500 kV Prefabricated Substations vs. Conventional Substations
The secondary equipment area of conventional substations uses reinforced concrete or prefabricated steel structures, facing issues like long construction cycles, unreasonable functional zone design, strict environmental assessments, dust, noise, and disturbances. Primary and secondary equipment can only be installed after civil works and decoration, lowering construction efficiency.Prefabricated cabin substations integrate modularity, intelligence, and cost - effectiveness, boasting green, energ
Dyson
06/13/2025
Operational Analysis of Prefabricated Enclosure Substations in Extreme Cold Climate Applications
Operational Analysis of Prefabricated Enclosure Substations in Extreme Cold Climate Applications
Under global climate diversity, alpine power construction faces technical and environmental challenges. Extreme climates, complex geology, and long - term low winter temperatures, along with ice, snow, and storms, strain electrical equipment stability and power facility construction (schedule, cost, maintenance). Traditional on - site substations, with long construction and poor adaptability, can’t meet alpine regions’ fast, stable power needs.Prefabricated cabin substations, as modu
Echo
06/13/2025
Implementation of Precast Foundations for Ring-Main Unit Compact Substations in Grid Modernization Initiatives
Implementation of Precast Foundations for Ring-Main Unit Compact Substations in Grid Modernization Initiatives
Compact substation boxes, with advantages like safe operation, high reliability, and easy maintenance, are used in urban grid construction/renovation. Structurally divided into American - style (high - cost, noisy, low - efficiency, gradually phased out) and European - style (large - sized but more advantages, still popular).To address their pros/cons, ring - network prefabricated ones were developed.I. Basic Materials for Prefabricated Compact Substation BoxesMaterials need hardness, strength,
Echo
06/13/2025
The design of the three-purpose grounding transformer
The design of the three-purpose grounding transformer
Underground Power Cable Transmission LinesDirect - buried power cable lines have large ground - distributed capacitance, causing high single - phase - to - ground short - circuit capacitive current. For 10 kV lines, if this current exceeds 10 A, arcs hardly self - extinguish, risking arc overvoltage and endangering line equipment. Arc extinction is thus necessary. With a Dyn - connected main transformer, an arc - suppression coil on the secondary neutral point suffices. For Yd - connected ones,
Dyson
06/12/2025
×
Inquiry
Download
Experts Electrical is dedicated to serving the personnel in the global power industry.
Join Experts Electrical, not only can you discover power equipment and power knowledge, but also canhnd like - minded friends!
商品视频播放