• Advance Earth Resistance Tester Digital Ground Resistance Test/Soil Resistivity Test Data Storage LCD Backlight
  • Advance Earth Resistance Tester Digital Ground Resistance Test/Soil Resistivity Test Data Storage LCD Backlight
  • Advance Earth Resistance Tester Digital Ground Resistance Test/Soil Resistivity Test Data Storage LCD Backlight
  • Advance Earth Resistance Tester Digital Ground Resistance Test/Soil Resistivity Test Data Storage LCD Backlight
  • Advance Earth Resistance Tester Digital Ground Resistance Test/Soil Resistivity Test Data Storage LCD Backlight
  • Advance Earth Resistance Tester Digital Ground Resistance Test/Soil Resistivity Test Data Storage LCD Backlight
Advance Earth Resistance Tester Digital Ground Resistance Test/Soil Resistivity Test Data Storage LCD Backlight
$515.00
Model
GR-40000/40000D
GR-40000/4000D
GR-40000/400D
GR-40000/40D
GR-40000/4D
GR-4000/40000D
GR-4000/4000D
GR-4000/400D
GR-4000/40D
GR-4000/4D
GR-400/40000D
GR-400/4000D
GR-400/400D
GR-400/40D
GR-400/4D
GR-40/40000D
GR-40/4000D
GR-40/400D
GR-40/40D
GR-40/4D
GR-4/40000D
GR-4/4000D
GR-4/400D
GR-4/40D
GR-4/4D
Basic info
Brand Wone
Model NO. UT572 Advance Earth Resistance Tester Digital Ground Resistance Test/Soil Resistivity Test Data Storage LCD Backlight
Earth resistance 40kΩ ±(3%+5)
Soil resistivity 40kΩm
Disturbance voltage 50V DC/AC
Disturbance frequency 40Hz~500Hz
Series GR
Product Detail

Feature

Certifications: CE, UKCA

  • Large 4-digit LCD Display, 5s sampling time

  • 2/3/4-wire earth resistance and soil resistivity measurements

  • Selectable test frequencies (94Hz/128Hz)

  • Disturbance voltage (Ust) and frequency (Fst) measurement

  • Earth resistance, RH and RS measurements

  • LCD backlight; auto power off

  • Data hold

  • 20 sets of data storage

  • Double insulation

  • Compensating resistance RK measurement

Specifications


image.png


image.png


image.png

How are ground resistance and soil resistivity measured?

Ground Resistance Measurement:

  • Four-Terminal Method: The UT572 typically uses the four-terminal method (also known as the Kelvin method) for ground resistance measurement. This approach involves two auxiliary electrodes (auxiliary current electrode and auxiliary voltage electrode) and a ground electrode under test for the measurement.

  • Current Injection: The tester injects a certain frequency current into the ground through the auxiliary current electrode.

  • Voltage Measurement: The voltage drop caused by the current is measured through the auxiliary voltage electrode.

  • Resistance Calculation: The ground resistance value is calculated based on the measured current and voltage drop.

Soil Resistivity Measurement:

  • Four-Terminal Method: The four-terminal method is also employed, which involves four electrodes (two current electrodes and two voltage electrodes) to measure the soil resistivity.

  • Current Injection: Current is injected into the soil through the current electrodes.

  • Voltage Measurement: The voltage drop caused by the current is measured through the voltage electrodes.

  • Resistivity Calculation: The soil resistivity is calculated based on the measured current and voltage drop.






Know your supplier
Wone
Main Categories
High voltage/Low voltage/Wire cable/Instrument meters/New energy/Tester/Production equipment/Generator/Electrical fittings/Integrated Electrical Equipment
Business Type
Design/Manufacture/Sales
Highest Annual Export (USD)
$50,000,000
Professional Experience
1 years
Workplace
65666m²m²
占位
占位
Related Products
Related Knowledges
Impact Analysis of Voltage Transformer Installation on Line Side vs. Load Side of Power Inlet Circuit Breaker for (ATS)
Impact Analysis of Voltage Transformer Installation on Line Side vs. Load Side of Power Inlet Circuit Breaker for (ATS)
Automatic backup switching (ABTS) devices are core components ensuring the safe, reliable, and stable operation of factory power grids. Their startup logic strictly follows the dual criteria of "loss of voltage in the working power supply + no - current detection", effectively avoiding misjudgments caused by secondary disconnection of voltage transformers (VTs) or maloperations of ABTS due to secondary circuit faults of current transformers (CTs). The activation condition requires both "no volta
James
07/03/2025
What tests need to be done on voltage transformers?
What tests need to be done on voltage transformers?
Practical Experience Sharing from an Electrical Engineer in the FieldBy Oliver, 8 Years in the Electrical IndustryHi everyone, I'm Oliver, and I've been working in the electrical industry for 8 years.From early involvement in substation commissioning and equipment inspection, to now managing the maintenance and fault analysis of entire power systems, one of the most frequently encountered devices in my work has been the voltage transformer (VT / PT).Recently, a friend who's just starting out ask
Oliver Watts
07/03/2025
What are the development trends of voltage transformers?
What are the development trends of voltage transformers?
By Echo, 12 Years in the Electrical IndustryHi everyone, I'm Echo, and I've been working in the electrical industry for 12 years.From early involvement in commissioning and maintenance of distribution rooms to later participation in electrical system design and equipment selection for large-scale projects, I’ve witnessed how voltage transformers have evolved — from traditional analog devices to intelligent, digital components.The other day, a new colleague from a power company asked
Echo
07/02/2025
Design of Electromagnetic Compatibility Performance for Electronic Voltage Transformers
Design of Electromagnetic Compatibility Performance for Electronic Voltage Transformers
With the rapid development of power systems, electronic voltage transformers (EVTs), as key measurement devices in power systems, their performance stability and reliability are crucial for the safe and stable operation of power systems. The electromagnetic compatibility (EMC) performance, as one of the core indicators of EVTs, is directly related to the ability of the device to work normally in complex electromagnetic environments and whether it will cause electromagnetic interference to other
Dyson
07/02/2025
Case Analysis of Abnormal Secondary Circuits in Voltage Transformers
Case Analysis of Abnormal Secondary Circuits in Voltage Transformers
1. Fault SituationIn September 2023, as a front - line fault maintenance worker, I detected abnormal voltage on the 10kV Section I bus of a substation during monitoring duty and informed the operation and maintenance team. The monitoring system showed: U0 = 0 kV, Ua = 6.06 kV, Ub = 5.93 kV, Uc = 6.05 kV, Uab = 10.05 kV, Ubc = 5.94 kVMy team and I rushed to the site. We suspected the secondary air circuit breaker of the 10kV Section I bus voltage transformer was closed and found the U - phase fus
Felix Spark
07/02/2025
What are the causes of failure of ferromagnetic voltage transformers in new energy power stations?
What are the causes of failure of ferromagnetic voltage transformers in new energy power stations?
By Felix, 15 Years in the Electrical IndustryHi everyone, I'm Felix, and I've been working in the electrical industry for 15 years.From early involvement in traditional substation commissioning and maintenance to now managing electrical system operations for multiple photovoltaic and wind power projects, one of the most frequently encountered devices I deal with is the Electromagnetic Voltage Transformer (PT).The other day, a shift operator at a new energy plant asked me:“We have an electr
Felix Spark
07/02/2025
×
Inquiry
Download
Experts Electrical is dedicated to serving the personnel in the global power industry.
Join Experts Electrical, not only can you discover power equipment and power knowledge, but also canhnd like - minded friends!