• Advance Earth Resistance Tester Digital Ground Resistance Test/Soil Resistivity Test Data Storage LCD Backlight
  • Advance Earth Resistance Tester Digital Ground Resistance Test/Soil Resistivity Test Data Storage LCD Backlight
  • Advance Earth Resistance Tester Digital Ground Resistance Test/Soil Resistivity Test Data Storage LCD Backlight
  • Advance Earth Resistance Tester Digital Ground Resistance Test/Soil Resistivity Test Data Storage LCD Backlight
  • Advance Earth Resistance Tester Digital Ground Resistance Test/Soil Resistivity Test Data Storage LCD Backlight
  • Advance Earth Resistance Tester Digital Ground Resistance Test/Soil Resistivity Test Data Storage LCD Backlight
Advance Earth Resistance Tester Digital Ground Resistance Test/Soil Resistivity Test Data Storage LCD Backlight
$515.00
Model
GR-40000/40000D
GR-40000/4000D
GR-40000/400D
GR-40000/40D
GR-40000/4D
GR-4000/40000D
GR-4000/4000D
GR-4000/400D
GR-4000/40D
GR-4000/4D
GR-400/40000D
GR-400/4000D
GR-400/400D
GR-400/40D
GR-400/4D
GR-40/40000D
GR-40/4000D
GR-40/400D
GR-40/40D
GR-40/4D
GR-4/40000D
GR-4/4000D
GR-4/400D
GR-4/40D
GR-4/4D
Basic info
Brand Wone
Model NO. UT572 Advance Earth Resistance Tester Digital Ground Resistance Test/Soil Resistivity Test Data Storage LCD Backlight
Earth resistance 4kΩ ±(3%+5)
Soil resistivity 4Ωm
Disturbance voltage 50V DC/AC
Disturbance frequency 40Hz~500Hz
Series GR
Product Detail

Feature

Certifications: CE, UKCA

  • Large 4-digit LCD Display, 5s sampling time

  • 2/3/4-wire earth resistance and soil resistivity measurements

  • Selectable test frequencies (94Hz/128Hz)

  • Disturbance voltage (Ust) and frequency (Fst) measurement

  • Earth resistance, RH and RS measurements

  • LCD backlight; auto power off

  • Data hold

  • 20 sets of data storage

  • Double insulation

  • Compensating resistance RK measurement

Specifications


image.png


image.png


image.png

How are ground resistance and soil resistivity measured?

Ground Resistance Measurement:

  • Four-Terminal Method: The UT572 typically uses the four-terminal method (also known as the Kelvin method) for ground resistance measurement. This approach involves two auxiliary electrodes (auxiliary current electrode and auxiliary voltage electrode) and a ground electrode under test for the measurement.

  • Current Injection: The tester injects a certain frequency current into the ground through the auxiliary current electrode.

  • Voltage Measurement: The voltage drop caused by the current is measured through the auxiliary voltage electrode.

  • Resistance Calculation: The ground resistance value is calculated based on the measured current and voltage drop.

Soil Resistivity Measurement:

  • Four-Terminal Method: The four-terminal method is also employed, which involves four electrodes (two current electrodes and two voltage electrodes) to measure the soil resistivity.

  • Current Injection: Current is injected into the soil through the current electrodes.

  • Voltage Measurement: The voltage drop caused by the current is measured through the voltage electrodes.

  • Resistivity Calculation: The soil resistivity is calculated based on the measured current and voltage drop.






Know your supplier
Wone
Main Categories
High voltage/Low voltage/Wire cable/Instrument meters/New energy/Tester/Production equipment/Generator/Electrical fittings/Integrated Electrical Equipment
Business Type
Design/Manufacture/Sales
Highest Annual Export (USD)
$50,000,000
Professional Experience
1 years
Workplace
65666m²m²
占位
占位
Related Products
Related Knowledges
Application of Pre-integrated Prefabricated Substations in Renewable Energy Sector
Application of Pre-integrated Prefabricated Substations in Renewable Energy Sector
Against the backdrop of profound changes in the global energy landscape and the booming development of the new energy industry, the construction mode of traditional substations struggles to meet the rapid deployment needs of new energy projects. The modular intelligent prefabricated cabin substation, leveraging its innovative advantages, has become a key direction for optimizing the new energy power system. In - depth exploration of its technical principles, industry adaptability, and applicatio
Echo
06/13/2025
Research on Reliability Enhancement Scheme Implementation for Modular Intelligent Prefabricated Substations
Research on Reliability Enhancement Scheme Implementation for Modular Intelligent Prefabricated Substations
1 Implementation Strategies for the Scheme1.1 Deepen Survey and ResearchBefore constructing prefabricated cabin - type substations, it is necessary to conduct detailed surveys of local working conditions, clarify the construction scale and objectives, evaluate existing power facilities, plan projects, make up for infrastructure shortcomings, and adjust the construction rhythm. Meanwhile, control costs to avoid project suspension.1.2 Strengthen Structural ConstructionDuring promotion, multi - dim
Echo
06/13/2025
Comparative Analysis of 500 kV Prefabricated Substations vs. Conventional Substations
Comparative Analysis of 500 kV Prefabricated Substations vs. Conventional Substations
The secondary equipment area of conventional substations uses reinforced concrete or prefabricated steel structures, facing issues like long construction cycles, unreasonable functional zone design, strict environmental assessments, dust, noise, and disturbances. Primary and secondary equipment can only be installed after civil works and decoration, lowering construction efficiency.Prefabricated cabin substations integrate modularity, intelligence, and cost - effectiveness, boasting green, energ
Dyson
06/13/2025
Operational Analysis of Prefabricated Enclosure Substations in Extreme Cold Climate Applications
Operational Analysis of Prefabricated Enclosure Substations in Extreme Cold Climate Applications
Under global climate diversity, alpine power construction faces technical and environmental challenges. Extreme climates, complex geology, and long - term low winter temperatures, along with ice, snow, and storms, strain electrical equipment stability and power facility construction (schedule, cost, maintenance). Traditional on - site substations, with long construction and poor adaptability, can’t meet alpine regions’ fast, stable power needs.Prefabricated cabin substations, as modu
Echo
06/13/2025
Implementation of Precast Foundations for Ring-Main Unit Compact Substations in Grid Modernization Initiatives
Implementation of Precast Foundations for Ring-Main Unit Compact Substations in Grid Modernization Initiatives
Compact substation boxes, with advantages like safe operation, high reliability, and easy maintenance, are used in urban grid construction/renovation. Structurally divided into American - style (high - cost, noisy, low - efficiency, gradually phased out) and European - style (large - sized but more advantages, still popular).To address their pros/cons, ring - network prefabricated ones were developed.I. Basic Materials for Prefabricated Compact Substation BoxesMaterials need hardness, strength,
Echo
06/13/2025
The design of the three-purpose grounding transformer
The design of the three-purpose grounding transformer
Underground Power Cable Transmission LinesDirect - buried power cable lines have large ground - distributed capacitance, causing high single - phase - to - ground short - circuit capacitive current. For 10 kV lines, if this current exceeds 10 A, arcs hardly self - extinguish, risking arc overvoltage and endangering line equipment. Arc extinction is thus necessary. With a Dyn - connected main transformer, an arc - suppression coil on the secondary neutral point suffices. For Yd - connected ones,
Dyson
06/12/2025
×
Inquiry
Download
Experts Electrical is dedicated to serving the personnel in the global power industry.
Join Experts Electrical, not only can you discover power equipment and power knowledge, but also canhnd like - minded friends!