• BI-DIRECTIONAL DC Fast Charger V2G/V2L/V2H
  • BI-DIRECTIONAL DC Fast Charger V2G/V2L/V2H
  • BI-DIRECTIONAL DC Fast Charger V2G/V2L/V2H
BI-DIRECTIONAL DC Fast Charger V2G/V2L/V2H
discuss personally
Model
WZ-V2G-40KW-1T
WZ-V2G-40KW-1J
WZ-V2G-40KW-1U
WZ-V2G-40KW-1E
WZ-V2G-40KW-1C
WZ-V2G-30KW-1C
WZ-V2G-30KW-1E
WZ-V2G-30KW-1U
WZ-V2G-30KW-1J
WZ-V2G-30KW-1T
WZ-V2G-15KW-1T
WZ-V2G-22KW-1T
WZ-V2G-22KW-1C
WZ-V2G-22KW-1E
WZ-V2G-22KW-1U
WZ-V2G-22KW-1J
WZ-V2G-15KW-1J
WZ-V2G-15KW-1E
WZ-V2G-15KW-1U
Basic info
Brand RW Energy
Model NO. BI-DIRECTIONAL DC Fast Charger
Rated Output Rating 40KW
Output Voltage DC 200-1000V
Power Conversion Efficiency ≥95%
Connector Options Tesla
Cable Length 5m
Input Voltage 380V
Series DC EV Chargers
Product Detail

BI-DIRECTIONAL DC Fast Charger

This BI-DIRECTIONAL DC Fast Charger supports three major modes: V2G (Vehicle-to-Grid), V2L (Vehicle-to-Load), and V2H (Vehicle-to-Home), redefining electrical energy interaction. With V2G technology, vehicles can charge during low-power consumption periods and feed power back to the grid during peak hours, aiding in peak shaving and valley filling while generating revenue. In V2L mode, the charger transforms into a high-power mobile power source, providing stable electricity for camping equipment, outdoor machinery, emergency rescue gear, and other loads. The V2H function enables electric vehicles to serve as home backup power, ensuring household appliances operate during power outages or optimizing home electricity costs. Supporting a maximum charging power of 350kW and discharging power of 100kW, it is equipped with an intelligent power regulation and bidirectional energy management system to ensure efficient, stable, and safe bidirectional power transmission, making it a core device for the future smart energy ecosystem.

Features:

  •  Connectors - GBT/CCS1/CCS2/CHAdeMO/Tesla.

  • Support V2G/V2L/V2H.

  • Configurable output power settings.

  • RFID Reader.

  • Optional Credit Card Reader.

  •  Station-level monitoring platform.

  • FRU Onboard Diagnostics.

  •  Easy to Service.

Specifications:

image.png

image.png

image.png

image.png

Bi-directional function:

  • V2G (Vehicle to Grid): Vehicle to grid. That is, electric vehicles can not only obtain electrical energy from the grid for charging, but also feed back the electrical energy in the vehicle battery to the grid under certain circumstances to realize reverse transmission of electrical energy. This helps to peak-shave and valley-fill the grid, improve the stability and efficiency of the grid. At the same time, vehicle owners may also obtain certain economic benefits.

  • V2L (Vehicle to Load): Vehicle to load. It can use electric vehicles as a mobile power source to supply power to other external load devices. For example, when camping outdoors, it can supply power to electric ovens, stereos and other devices, expanding the usage scenarios of electric vehicles.

  • V2H (Vehicle to Home): Vehicle to home. It enables electric vehicles to be connected to the home's power system and provide emergency power for the home in case of power outages or charge at low electricity prices and supply power to the home at peak times to save home electricity costs.

what is V2G technology? In short, it is based on two-way charging piles, combined with energy management systems and cloud platform intelligent scheduling technology, and connected to the power grid dispatching system to realize the intelligent two-way transmission of electrical energy between the power grid and vehicles, meeting the purposes of vehicle transportation, new energy access, and stable control of the power grid.

Know your supplier
RW Energy
Zhejiang Rockwell Energy Technology Co., Ltd. is an international enterprise specializing in the research, development and manufacturing of recloser controllers, power quality management, power monitoring systems and other high-end power equipment. In today's critical period of global energy transition and power system upgrading, the company has gathered a group of top talents in the fields of power engineering, automation control, software development, etc., who carry the enthusiasm and persistence for the power business, and are committed to overcoming the complex problems in the power system, and promoting the intelligent development of the power industry with innovative technology. Mission: To make global electricity smarter, more reliable and more efficient with innovative technology. Vision: To be the leader in global power intelligence.
Main Categories
High voltage/New energy/Tester
Business Type
Design/Manufacture/Sales
Highest Annual Export (USD)
$100000000
Professional Experience
12 years
Workplace
30000m²
占位
占位
Related Products
Related Knowledges
Installation and Commissioning of 10kV Dry-Type Transformers
Installation and Commissioning of 10kV Dry-Type Transformers
By James, 10 Years of Electrical Equipment Maintenance ExperienceHi everyone, I’m James, and I’ve been working in electrical equipment fault repair for 10 years.Over the past decade, I’ve worked in factories, substations, and distribution rooms of all sizes, involved in the installation, commissioning, maintenance, and troubleshooting of dry-type transformers. Dry-type transformers are among the most common electrical devices we deal with on a daily basis.Today, a new colleague
James
07/01/2025
What are the reasons for low insulation at the low-voltage side of a dry-type transformer?
What are the reasons for low insulation at the low-voltage side of a dry-type transformer?
Hi everyone, I’m Felix, and I’ve been working in electrical equipment fault repair for 15 years.Over these years, I’ve traveled across factories, substations, and distribution rooms all over the country, troubleshooting and repairing all kinds of electrical equipment. Dry-type transformers are among the most common devices we deal with.Today, a friend asked me:“What does it mean when the low-voltage side of a dry-type transformer has low insulation resistance?”Great
Felix Spark
07/01/2025
What tests are required for dry-type transformers?
What tests are required for dry-type transformers?
1 Pre - commissioning InspectionAs a front - line tester, before formally commissioning a dry - type transformer, I need to carry out a comprehensive and systematic inspection. First, I conduct a visual inspection of the transformer body and its accessories, carefully checking for mechanical damage or deformation. Then, I check whether the leads of the high - and low - voltage windings are firmly connected and whether the bolt tightening torque meets the standard requirements (usually 40 - 60N&m
Oliver Watts
07/01/2025
What aspects need attention during the installation of dry-type transformers?
What aspects need attention during the installation of dry-type transformers?
1 Pre - installation PreparationAs a front - line installer, I know very well that the preparation work before installing a dry - type transformer must be thorough. First, I will carefully review the design drawings and technical documents, and check one by one the technical parameters such as the model specification, rated capacity, and voltage level of the transformer to ensure they are in full compliance with the design requirements. Then, I will conduct an unpacking inspection of the transfo
James
07/01/2025
What are the causes of dry-type transformers burning out during operation?
What are the causes of dry-type transformers burning out during operation?
1 Fault PhenomenonI am engaged in front - line fault maintenance work, and recently encountered problems with dry - type transformers. Dry - type transformers have a simple structure, are convenient for transportation, and easy for maintenance. They are widely used in power distribution places with relatively high environmental protection requirements. Because of their good fire - resistance, they can be installed in load - center areas to reduce voltage loss and power loss.The property manageme
Felix Spark
07/01/2025
Method for Automatic Isolation of Customer Equipment Faults by Load Switches in Distribution Networks
Method for Automatic Isolation of Customer Equipment Faults by Load Switches in Distribution Networks
1 OverviewDistribution network safety has long been under - addressed, with its automation lagging substation automation . Using 10 kV intervals of existing substations to set line section points meets future grid needs . Configuration of distribution switches, section switches, and protection must match substation outgoing - line protection for reliability. Fault isolation, self - healing, and restoration are key to distribution automation .Scholars have studied smart distribution network fault
Felix Spark
06/30/2025
×
Inquiry
Download
Experts Electrical is dedicated to serving the personnel in the global power industry.
Join Experts Electrical, not only can you discover power equipment and power knowledge, but also canhnd like - minded friends!