• 252kV HV Gas Insulated Switchgear (GIS)
252kV HV Gas Insulated Switchgear (GIS)
discuss personally
Model
ZF28-252/3150-50
Basic info
Brand ROCKWILL
Model NO. 252KV SF6 Gas-insulated GIS high voltage switchgear
Rated voltage 252kV
Rated normal current 3150A
Series ZF28
Product Detail

Product Overview:

 ZF28-252 type GIS is composed of standard modules through flanged joint, which can meet the demand for substation optimization design through the flexible combination between modules. It saves space and conforms to technical requests.
This product can be applied to power system, power generation, rail transportation, petrochemical, metallurgy, mining, building materials and other large industrial consumer.

Features:

  •  Special arc extinguish chamber design with spring operation mechanism.

  •  The structure is tight and the minimum interval width can reach 1670mm.

  •  Three phase encapsulated main bus-bar and 3- position disconnector and earthing switch.

  • Self- researched 3-position disconnector and earthing switch.

  • Completely self-research and development with high starting point and large investment.

  •  Inspected to be qualified by KEMA.

  •  High level of parameters, advanced structural design.

  •  Insulation level is higher than IEC and GB standards.

  • Self-blast combined interrupter, 3- position disconnector and earthing switch, spring operating mechanism.

  •  Double sealing ring structure.

  • Minimum area; Compact and standardized module design with minimum intervals width 1670mm.

  •  It is applied to cold, humid, salt fog, coastal, high altitude areas.

  • Spring operating mechanism base.

Technical Parameters:

ZF28-252 GIS .png

What are the basic principles of GIS operation ?

  • Under normal circumstances, the circuit breaker and disconnector of GIS equipment are mainly operated remotely, and the "remote/local" opening of the circuit breaker and disconnector is concerned about the "remote" position.

  • The grounding switch of GIS equipment can only be operated on the spot, and the knife will be opened "remote/local" and concerned about the "local" during operation.

  • In any case, only the program can be operated, and the "interlock release switch" on the control cabinet must be in the "interlocking" position, and the unlocking key is sealed together with the microcomputer anti-mistaken unlocking key, and is used according to the same regulations.


Know your supplier
ROCKWILL
Rockwill Electric Group Global Manufacturer of High voltage and medium-voltage power equipment and smart grid solutions. Headquartered in Wenzhou, China. Serving 100+ countries with quality, innovation, and trust. What We Offer: • HV-MV switchgear (VCB, SF₆ circuit breakers, RMU, GIS) • Distribution transformers and substations • Smart grid and monitoring systems • Solar, wind, EV charging, and energy storage solutions • EPC turnkey power projects Certified: ISO 9001 / ISO 14001 / ISO 45001
Main Categories
High voltage
Business Type
Design/Manufacture/Sales
Highest Annual Export (USD)
$150,000,000
Professional Experience
16 years
Workplace
108000m²m²
占位
占位
Related Products
Related Knowledges
Impact Analysis of Voltage Transformer Installation on Line Side vs. Load Side of Power Inlet Circuit Breaker for (ATS)
Impact Analysis of Voltage Transformer Installation on Line Side vs. Load Side of Power Inlet Circuit Breaker for (ATS)
Automatic backup switching (ABTS) devices are core components ensuring the safe, reliable, and stable operation of factory power grids. Their startup logic strictly follows the dual criteria of "loss of voltage in the working power supply + no - current detection", effectively avoiding misjudgments caused by secondary disconnection of voltage transformers (VTs) or maloperations of ABTS due to secondary circuit faults of current transformers (CTs). The activation condition requires both "no volta
James
07/03/2025
What tests need to be done on voltage transformers?
What tests need to be done on voltage transformers?
Practical Experience Sharing from an Electrical Engineer in the FieldBy Oliver, 8 Years in the Electrical IndustryHi everyone, I'm Oliver, and I've been working in the electrical industry for 8 years.From early involvement in substation commissioning and equipment inspection, to now managing the maintenance and fault analysis of entire power systems, one of the most frequently encountered devices in my work has been the voltage transformer (VT / PT).Recently, a friend who's just starting out ask
Oliver Watts
07/03/2025
What are the development trends of voltage transformers?
What are the development trends of voltage transformers?
By Echo, 12 Years in the Electrical IndustryHi everyone, I'm Echo, and I've been working in the electrical industry for 12 years.From early involvement in commissioning and maintenance of distribution rooms to later participation in electrical system design and equipment selection for large-scale projects, I’ve witnessed how voltage transformers have evolved — from traditional analog devices to intelligent, digital components.The other day, a new colleague from a power company asked
Echo
07/02/2025
Design of Electromagnetic Compatibility Performance for Electronic Voltage Transformers
Design of Electromagnetic Compatibility Performance for Electronic Voltage Transformers
With the rapid development of power systems, electronic voltage transformers (EVTs), as key measurement devices in power systems, their performance stability and reliability are crucial for the safe and stable operation of power systems. The electromagnetic compatibility (EMC) performance, as one of the core indicators of EVTs, is directly related to the ability of the device to work normally in complex electromagnetic environments and whether it will cause electromagnetic interference to other
Dyson
07/02/2025
Case Analysis of Abnormal Secondary Circuits in Voltage Transformers
Case Analysis of Abnormal Secondary Circuits in Voltage Transformers
1. Fault SituationIn September 2023, as a front - line fault maintenance worker, I detected abnormal voltage on the 10kV Section I bus of a substation during monitoring duty and informed the operation and maintenance team. The monitoring system showed: U0 = 0 kV, Ua = 6.06 kV, Ub = 5.93 kV, Uc = 6.05 kV, Uab = 10.05 kV, Ubc = 5.94 kVMy team and I rushed to the site. We suspected the secondary air circuit breaker of the 10kV Section I bus voltage transformer was closed and found the U - phase fus
Felix Spark
07/02/2025
What are the causes of failure of ferromagnetic voltage transformers in new energy power stations?
What are the causes of failure of ferromagnetic voltage transformers in new energy power stations?
By Felix, 15 Years in the Electrical IndustryHi everyone, I'm Felix, and I've been working in the electrical industry for 15 years.From early involvement in traditional substation commissioning and maintenance to now managing electrical system operations for multiple photovoltaic and wind power projects, one of the most frequently encountered devices I deal with is the Electromagnetic Voltage Transformer (PT).The other day, a shift operator at a new energy plant asked me:“We have an electr
Felix Spark
07/02/2025
×
Inquiry
Download
Experts Electrical is dedicated to serving the personnel in the global power industry.
Join Experts Electrical, not only can you discover power equipment and power knowledge, but also canhnd like - minded friends!