• 252kV HV SF6 Circuit Breaker with Copper Material
252kV HV SF6 Circuit Breaker with Copper Material
discuss personally
Model
LW35-252/4000-50
Basic info
Brand ROCKWILL
Model NO. 252KV SF6 Circuit Breaker with Copper Material
Rated voltage 252kV
Rated normal current 4000A
Series LW35
Product Detail

Description:

LW35S-252 self-energizing SF6 circuit-breaker (with spring operating mechanism) is outdoor three-phase AC 50Hz high-voltage power transmission and transformation equipment, which is used to divide and combine rated current, break fault current or convert line to realize power transmission and transformation system The control and protection of the three-pole opening, closing and fast automatic reclosing operation can be carried out.

The circuit-breaker adopts the principle of self-energy type arc extinguishing, has the advantages of simple structure, small size, small operation power, high reliability, easy installation and low noise. It is a new generation of self-energetic series high pressure SF6 gas circuit-breaker developed by our company.


Main Features:


  • Less consumption of SF6 gas, beneficial for environmental protection. When other kinds of circuit breaker at 0.6 MPa must be filled with SF6 of 27 kg/set, this kind of circuit breaker only need 19.3 kg/set.

  • Dynamic sealing system adopts advanced Glyd ring and Step seal to reduce starting friction and prevent leakage.

  • Adopt imported control valve of stable performance and anti-slow-opening function in case of pressure loss.

  • Two sets of independent opening control circuit are adopted in hydraulic mechanism with two sets of relay protection to enhance service reliability.

Technical parameter:


1720751277890.png

What are the moisture content requirements in the interrupter interrupter of the tank circuit breaker?

  • Moisture Content: The SF₆ gas in the arc quenching chamber has strict limits on moisture content, typically requiring it to be no more than 150 ppm (by volume). Moisture can react with the substances produced when SF₆ gas decomposes under the influence of the arc, generating corrosive substances such as hydrofluoric acid and sulfur dioxide. These corrosive substances can corrode the internal metal components and insulating materials of the arc quenching chamber, accelerating the aging and damage of the equipment, and affecting its service life and performance.

  • Moisture Condensation: Moisture can also condense into liquid water in low-temperature environments, reducing the pressure of the SF₆ gas and affecting the insulation performance and arc-quenching effectiveness of the arc quenching chamber.

Know your supplier
ROCKWILL
Rockwill Electric Group Global Manufacturer of High voltage and medium-voltage power equipment and smart grid solutions. Headquartered in Wenzhou, China. Serving 100+ countries with quality, innovation, and trust. What We Offer: • HV-MV switchgear (VCB, SF₆ circuit breakers, RMU, GIS) • Distribution transformers and substations • Smart grid and monitoring systems • Solar, wind, EV charging, and energy storage solutions • EPC turnkey power projects Certified: ISO 9001 / ISO 14001 / ISO 45001
Main Categories
High voltage
Business Type
Design/Manufacture/Sales
Highest Annual Export (USD)
$150,000,000
Professional Experience
16 years
Workplace
108000m²m²
占位
占位
Related Products
Related Knowledges
What are the troubleshooting methods for current transformers?
What are the troubleshooting methods for current transformers?
As a front - line fault maintenance worker, I deal with current transformers (CTs) daily. A CT’s secondary winding in operation must never open - circuit! Once open - circuited, the secondary current and demagnetizing potential vanish. All primary - side magnetic potential then becomes the iron core’s exciting potential, sharply increasing its magnetic flux density. High voltage on the secondary side will endanger safety anytime.Despite strict power operation regulations, user electr
Felix Spark
07/04/2025
What are the criteria for selection of distribution transformer?
What are the criteria for selection of distribution transformer?
Transformer Selection Criteria: Essential Factors for Optimal PerformanceSelecting the appropriate transformer is critical for ensuring power distribution reliability across industrial, commercial, and residential systems. This process requires meticulous evaluation of load dynamics, environmental constraints, and regulatory standards. Below we outline key selection criteria to guide engineers and designers in making informed decisions.1. Maximum Demand AssessmentThe transformer’s capacity (kVA)
Master Electrician
07/03/2025
What are the causes of current transformer faults and the countermeasures for faults?
What are the causes of current transformer faults and the countermeasures for faults?
As a front - line maintenance technician, I deal with current transformers (CTs) daily. CTs convert high - magnitude primary current to low - magnitude secondary current for substation/line protection and measurement, operating in series long - term. However, they face faults from external (unbalanced loads, wrong wiring, etc.) and internal (insulation defects) issues. These faults, like secondary open - circuits or insulation breakdown, harm measurement accuracy, protection operation, and grid
Felix Spark
07/03/2025
Testing of Optical Current Transformers (OCT)
Testing of Optical Current Transformers (OCT)
With the development of modern economy and science and technology, photoelectric current transformers (PECTs) have fully transitioned from the trial operation stage to practical application. As a front - line testing personnel, I deeply feel their importance in the power system during daily work. I also realize the necessity of conducting in - depth research on their testing systems and calibration methods. This not only promotes the engineering application of PECTs but also enables the accurate
Oliver Watts
07/03/2025
Impact Analysis of Voltage Transformer Installation on Line Side vs. Load Side of Power Inlet Circuit Breaker for (ATS)
Impact Analysis of Voltage Transformer Installation on Line Side vs. Load Side of Power Inlet Circuit Breaker for (ATS)
Automatic backup switching (ABTS) devices are core components ensuring the safe, reliable, and stable operation of factory power grids. Their startup logic strictly follows the dual criteria of "loss of voltage in the working power supply + no - current detection", effectively avoiding misjudgments caused by secondary disconnection of voltage transformers (VTs) or maloperations of ABTS due to secondary circuit faults of current transformers (CTs). The activation condition requires both "no volta
James
07/03/2025
What tests need to be done on voltage transformers?
What tests need to be done on voltage transformers?
Practical Experience Sharing from an Electrical Engineer in the FieldBy Oliver, 8 Years in the Electrical IndustryHi everyone, I'm Oliver, and I've been working in the electrical industry for 8 years.From early involvement in substation commissioning and equipment inspection, to now managing the maintenance and fault analysis of entire power systems, one of the most frequently encountered devices in my work has been the voltage transformer (VT / PT).Recently, a friend who's just starting out ask
Oliver Watts
07/03/2025
×
Inquiry
Download
Experts Electrical is dedicated to serving the personnel in the global power industry.
Join Experts Electrical, not only can you discover power equipment and power knowledge, but also canhnd like - minded friends!