• WDYZ-205 Zinc oxide arrester live tester
  • WDYZ-205 Zinc oxide arrester live tester
WDYZ-205 Zinc oxide arrester live tester
$2000.00
Model
MOAT-205
Basic info
Brand Wone
Model NO. WDYZ-205 Zinc oxide arrester live tester
Rated frequency 50Hz
Series WDYZ-205
Product Detail

Description

WDYZ-205 Zinc Oxide Arrester Live Tester completely solves the problem of on-site live test of 6-35kV Zinc Oxide Arrester. Realize the on-line uninterrupted test of zinc oxide arrester!

 No need to climb poles, no wiring, fast and accurate test!

The tester is suitable for voltage levels of 6kV-500kV and has a variety of sampling methods. It is a special instrument for testing the electrical performance of zinc oxide arresters.

 Dangerous defects such as damping of the internal insulation of the equipment and aging of the valve plate.

Specifications

  •  Working power supply:

    Host - internal battery power supply, charging time > 3 hours, continuous work > 8 hours.

    Wireless Current Clamp - Powered by internal battery, charging time > 1 hour, continuous working > 8 hours.

  •  Measuring range:

    Host leakage current: 0.000-20mA (expandable).

    Host voltage: 30-250V (expandable).

    Wireless current clamp current: 0-20mA (expandable).

    Wireless current clamp voltage: 0-60kV (bare wire 0-35kV).

    Wireless current clamp jaw: Ø33mm.

    Wireless current clamp transmission distance > 30 meters.

  •  Measurement accuracy:

    Current: When the full current is >100μA: ±5% reading ±1 word.

    Voltage: When the reference voltage signal is >30V: ±5% reading ±1 word.

  •  Measurement parameters:

      Leakage current: full current waveform, fundamental RMS value, peak value.

      Leakage Current Resistive Component: Waveform.

      1, 3, 5, 7, 9 valid values.

      Positive peak Ir+ Negative peak Ir-.

     Capacitive current fundamental.

     Voltage: voltage waveform, voltage RMS.

      Phase angle difference, power consumption.

  •  Lithium battery parameters:

    Charging time > 2.5 hours.

    Continuous working time > 7 hours.

    Intermittent working time > 7×24 hours.

  •      Main box size and weight:

     Main box: 42cm×34cm×18cm.

      Host: 7.0kg.

  • Insulation rod size and weight:

    Wireless current clamp 70mm×30mm×250mm 0.5KG.

    Insulation rod Ø30mm×1000mm 5 pieces 5.0KG.

    Wire pack box 1000×100mm×240mm 6.2KG.







Know your supplier
Wone
Main Categories
High voltage/Low voltage/Wire cable/Instrument meters/New energy/Tester/Production equipment/Generator/Electrical fittings/Integrated Electrical Equipment
Business Type
Design/Manufacture/Sales
Highest Annual Export (USD)
$50,000,000
Professional Experience
1 years
Workplace
65666m²m²
占位
占位
Related Products
Related Knowledges
Modular Intelligent Substation - Prefabricated Secondary Switchgear Integration Assembly
Modular Intelligent Substation - Prefabricated Secondary Switchgear Integration Assembly
With the development of the national economy and society, the requirements for the quality and craftsmanship of power grid projects have become increasingly stringent. The need to improve the construction progress and quality of substations has created opportunities for the promotion of prefabricated cabin - type intelligent substations. The traditional on - site wiring and commissioning of secondary substation equipment involve a large amount of work. Moreover, on - site construction has to wai
Echo
06/13/2025
Application of Pre-integrated Prefabricated Substations in Renewable Energy Sector
Application of Pre-integrated Prefabricated Substations in Renewable Energy Sector
Against the backdrop of profound changes in the global energy landscape and the booming development of the new energy industry, the construction mode of traditional substations struggles to meet the rapid deployment needs of new energy projects. The modular intelligent prefabricated cabin substation, leveraging its innovative advantages, has become a key direction for optimizing the new energy power system. In - depth exploration of its technical principles, industry adaptability, and applicatio
Echo
06/13/2025
Research on Reliability Enhancement Scheme Implementation for Modular Intelligent Prefabricated Substations
Research on Reliability Enhancement Scheme Implementation for Modular Intelligent Prefabricated Substations
1 Implementation Strategies for the Scheme1.1 Deepen Survey and ResearchBefore constructing prefabricated cabin - type substations, it is necessary to conduct detailed surveys of local working conditions, clarify the construction scale and objectives, evaluate existing power facilities, plan projects, make up for infrastructure shortcomings, and adjust the construction rhythm. Meanwhile, control costs to avoid project suspension.1.2 Strengthen Structural ConstructionDuring promotion, multi - dim
Echo
06/13/2025
Comparative Analysis of 500 kV Prefabricated Substations vs. Conventional Substations
Comparative Analysis of 500 kV Prefabricated Substations vs. Conventional Substations
The secondary equipment area of conventional substations uses reinforced concrete or prefabricated steel structures, facing issues like long construction cycles, unreasonable functional zone design, strict environmental assessments, dust, noise, and disturbances. Primary and secondary equipment can only be installed after civil works and decoration, lowering construction efficiency.Prefabricated cabin substations integrate modularity, intelligence, and cost - effectiveness, boasting green, energ
Dyson
06/13/2025
Operational Analysis of Prefabricated Enclosure Substations in Extreme Cold Climate Applications
Operational Analysis of Prefabricated Enclosure Substations in Extreme Cold Climate Applications
Under global climate diversity, alpine power construction faces technical and environmental challenges. Extreme climates, complex geology, and long - term low winter temperatures, along with ice, snow, and storms, strain electrical equipment stability and power facility construction (schedule, cost, maintenance). Traditional on - site substations, with long construction and poor adaptability, can’t meet alpine regions’ fast, stable power needs.Prefabricated cabin substations, as modu
Echo
06/13/2025
Implementation of Precast Foundations for Ring-Main Unit Compact Substations in Grid Modernization Initiatives
Implementation of Precast Foundations for Ring-Main Unit Compact Substations in Grid Modernization Initiatives
Compact substation boxes, with advantages like safe operation, high reliability, and easy maintenance, are used in urban grid construction/renovation. Structurally divided into American - style (high - cost, noisy, low - efficiency, gradually phased out) and European - style (large - sized but more advantages, still popular).To address their pros/cons, ring - network prefabricated ones were developed.I. Basic Materials for Prefabricated Compact Substation BoxesMaterials need hardness, strength,
Echo
06/13/2025
×
Inquiry
Download
Experts Electrical is dedicated to serving the personnel in the global power industry.
Join Experts Electrical, not only can you discover power equipment and power knowledge, but also canhnd like - minded friends!
商品视频播放