JDQXF-110-0.5P
Basic info
Brand Wone
Model NO. JDQXF-110 SF6 Gas Insulated Voltage Transformer
Primary voltage 110√3KV
Nominal voltage 110KV
insulation level 126/200/480KV
Series JDQXF-110
Product Detail

Description:

An instrument used to convert voltage. However, the purpose of the transformer to convert the voltage is to facilitate the transmission of electric energy, so the capacity is very large, and it is generally calculated in kilovolt-ampere or megavolt-ampere; The purpose of the voltage transformer is to convert the voltage, which is mainly used to supply power to the measuring instrument and relay protection device, and is used to measure the voltage, power and electric energy of the line.

Industry applications:

It is suitable for outdoor and neutral point effective grounding in 110kV and 50kV AC power systems, for electric energy, voltage measurement and relay protection.

Features:

  •  This product is a single-phase, independent SF6 gas-insulated voltage transformer, which adopts a vertical structure, which is composed of several parts, such as a body, a metal shell, a lead pipe and a porcelain sleeve.

  • The transformer windings are single-stage structured, and the composite insulation composed of SF6 gas and rhombic dispensing polyester film can withstand high voltages. The low-voltage winding and high-voltage winding are equipped with internal and external electrostatic screens, and the high-voltage winding is also equipped with a shielding cover to further improve the field strength distribution. The high and low voltage windings are installed on the mouth core in a rectangular shape, and the whole body is fixed in the shell, and the shell is connected to the casing.

  •  The product is equipped with a primary connection plate, a grounding seat, a secondary junction box, an inflatable joint, a pressure gauge (density controller), an adsorbent and an anti-riot sheet.

  •  All sealing parts are sealed with O-shaped sealant gasket and coated with waterproof glue on the outside; The whole product is in a fully sealed state, and the product is filled with gas with rated pressure to ensure the normal operation of the product.

Technical parameters:

image.png


Dimension:

image.png


Product show:

091029818218004659.jpg


Why choose us:

  • We have a professional service team.

  • We have good after-sales.

  • We can guarantee the quality of our products.



Know your supplier
Wone
Main Categories
High voltage/Low voltage/Wire cable/Instrument meters/New energy/Tester/Production equipment/Generator/Electrical fittings/Integrated Electrical Equipment
Business Type
Design/Manufacture/Sales
Highest Annual Export (USD)
$50,000,000
Professional Experience
1 years
Workplace
65666m²m²
占位
占位
Related Products
Related Knowledges
What are the causes of failure of ferromagnetic voltage transformers in new energy power stations?
What are the causes of failure of ferromagnetic voltage transformers in new energy power stations?
By Felix, 15 Years in the Electrical IndustryHi everyone, I'm Felix, and I've been working in the electrical industry for 15 years.From early involvement in traditional substation commissioning and maintenance to now managing electrical system operations for multiple photovoltaic and wind power projects, one of the most frequently encountered devices I deal with is the Electromagnetic Voltage Transformer (PT).The other day, a shift operator at a new energy plant asked me:“We have an electr
Felix Spark
07/02/2025
In which directions will dry-type transformers develop in the future?
In which directions will dry-type transformers develop in the future?
By Echo, 12 Years in the Electrical IndustryHi everyone, I'm Echo, and I've been working in the electrical industry for 12 years.From my early days doing commissioning and maintenance in distribution rooms, to later participating in electrical system design and equipment selection for large-scale projects, I’ve witnessed how dry-type transformers have evolved from traditional tools into smarter, greener devices.Recently, a new colleague asked me:“What’s the current state of dry
Echo
07/02/2025
Installation and Commissioning of 10kV Dry-Type Transformers
Installation and Commissioning of 10kV Dry-Type Transformers
By James, 10 Years of Electrical Equipment Maintenance ExperienceHi everyone, I’m James, and I’ve been working in electrical equipment fault repair for 10 years.Over the past decade, I’ve worked in factories, substations, and distribution rooms of all sizes, involved in the installation, commissioning, maintenance, and troubleshooting of dry-type transformers. Dry-type transformers are among the most common electrical devices we deal with on a daily basis.Today, a new colleague
James
07/01/2025
What are the reasons for low insulation at the low-voltage side of a dry-type transformer?
What are the reasons for low insulation at the low-voltage side of a dry-type transformer?
Hi everyone, I’m Felix, and I’ve been working in electrical equipment fault repair for 15 years.Over these years, I’ve traveled across factories, substations, and distribution rooms all over the country, troubleshooting and repairing all kinds of electrical equipment. Dry-type transformers are among the most common devices we deal with.Today, a friend asked me:“What does it mean when the low-voltage side of a dry-type transformer has low insulation resistance?”Great
Felix Spark
07/01/2025
What tests are required for dry-type transformers?
What tests are required for dry-type transformers?
1 Pre - commissioning InspectionAs a front - line tester, before formally commissioning a dry - type transformer, I need to carry out a comprehensive and systematic inspection. First, I conduct a visual inspection of the transformer body and its accessories, carefully checking for mechanical damage or deformation. Then, I check whether the leads of the high - and low - voltage windings are firmly connected and whether the bolt tightening torque meets the standard requirements (usually 40 - 60N&m
Oliver Watts
07/01/2025
What aspects need attention during the installation of dry-type transformers?
What aspects need attention during the installation of dry-type transformers?
1 Pre - installation PreparationAs a front - line installer, I know very well that the preparation work before installing a dry - type transformer must be thorough. First, I will carefully review the design drawings and technical documents, and check one by one the technical parameters such as the model specification, rated capacity, and voltage level of the transformer to ensure they are in full compliance with the design requirements. Then, I will conduct an unpacking inspection of the transfo
James
07/01/2025
×
Inquiry
Download
Experts Electrical is dedicated to serving the personnel in the global power industry.
Join Experts Electrical, not only can you discover power equipment and power knowledge, but also canhnd like - minded friends!