• Full Automatic Servo Touch Screen APG machine
Full Automatic Servo Touch Screen APG machine
$43000.00
Model
HMI-1200
Basic info
Brand Wone
Model NO. Full Automatic Servo Touch Screen APG machine
Heating power 24Kw
Series HMI-1200
Product Detail

Description

This machine is full automatic, Servo and PLC touch screen control. Machine Advantages:

  • Servo motor control

  • PLC touch screen Control

  • Fully automatic design

  Auto start machine & heating clamp plate.

  Auto setting hydraulic pressure

  Auto setting heating temperature

  Auto setting valve flow

  • Can save more than 100 product datas.

Specifications

Model NO.

HAPG-860-double

Clamp plate sizemm

1000*1200

Clamp force

18T

Min/Max clamp plate strokemm

240*2000

Upper&Lower core puller strokemm

760*350

Heating power

24Kw

Hydraulic station power

7.5kW

Horizontal tilting angle

0-5°

mould load weight

2T

Machine weight

4.8T

Machine dimensionmm

6400*2000*2800

machine work process

企业微信截图_17204031354027.png

企业微信截图_17204032743267.png




Know your supplier
Wone
Main Categories
High voltage/Low voltage/Wire cable/Instrument meters/New energy/Tester/Production equipment/Generator/Electrical fittings/Integrated Electrical Equipment
Business Type
Design/Manufacture/Sales
Highest Annual Export (USD)
$50,000,000
Professional Experience
1 years
Workplace
65666m²m²
占位
占位
Related Products
Related Knowledges
What are the application and improvement directions of current transformers in power systems?
What are the application and improvement directions of current transformers in power systems?
As a front - line power operation and maintenance worker, I deal with current transformers (CTs) daily. Having witnessed the popularization of new photoelectric CTs and tackled numerous faults, I’ve gained practical insights into their application and testing improvements. Below, I’ll share my on - site experience with new CTs in power systems, aiming for a balance between professionalism and practicality.1. Application of New CTs in Power Systems1.1 CTs in Power SystemsMost new CTs
Echo
07/04/2025
What are the troubleshooting methods for current transformers?
What are the troubleshooting methods for current transformers?
As a front - line fault maintenance worker, I deal with current transformers (CTs) daily. A CT’s secondary winding in operation must never open - circuit! Once open - circuited, the secondary current and demagnetizing potential vanish. All primary - side magnetic potential then becomes the iron core’s exciting potential, sharply increasing its magnetic flux density. High voltage on the secondary side will endanger safety anytime.Despite strict power operation regulations, user electr
Felix Spark
07/04/2025
What are the criteria for selection of distribution transformer?
What are the criteria for selection of distribution transformer?
Transformer Selection Criteria: Essential Factors for Optimal PerformanceSelecting the appropriate transformer is critical for ensuring power distribution reliability across industrial, commercial, and residential systems. This process requires meticulous evaluation of load dynamics, environmental constraints, and regulatory standards. Below we outline key selection criteria to guide engineers and designers in making informed decisions.1. Maximum Demand AssessmentThe transformer’s capacity (kVA)
Master Electrician
07/03/2025
What are the causes of current transformer faults and the countermeasures for faults?
What are the causes of current transformer faults and the countermeasures for faults?
As a front - line maintenance technician, I deal with current transformers (CTs) daily. CTs convert high - magnitude primary current to low - magnitude secondary current for substation/line protection and measurement, operating in series long - term. However, they face faults from external (unbalanced loads, wrong wiring, etc.) and internal (insulation defects) issues. These faults, like secondary open - circuits or insulation breakdown, harm measurement accuracy, protection operation, and grid
Felix Spark
07/03/2025
Testing of Optical Current Transformers (OCT)
Testing of Optical Current Transformers (OCT)
With the development of modern economy and science and technology, photoelectric current transformers (PECTs) have fully transitioned from the trial operation stage to practical application. As a front - line testing personnel, I deeply feel their importance in the power system during daily work. I also realize the necessity of conducting in - depth research on their testing systems and calibration methods. This not only promotes the engineering application of PECTs but also enables the accurate
Oliver Watts
07/03/2025
Impact Analysis of Voltage Transformer Installation on Line Side vs. Load Side of Power Inlet Circuit Breaker for (ATS)
Impact Analysis of Voltage Transformer Installation on Line Side vs. Load Side of Power Inlet Circuit Breaker for (ATS)
Automatic backup switching (ABTS) devices are core components ensuring the safe, reliable, and stable operation of factory power grids. Their startup logic strictly follows the dual criteria of "loss of voltage in the working power supply + no - current detection", effectively avoiding misjudgments caused by secondary disconnection of voltage transformers (VTs) or maloperations of ABTS due to secondary circuit faults of current transformers (CTs). The activation condition requires both "no volta
James
07/03/2025
×
Inquiry
Download
Experts Electrical is dedicated to serving the personnel in the global power industry.
Join Experts Electrical, not only can you discover power equipment and power knowledge, but also canhnd like - minded friends!