• DC Load Bank - 200KW750VDC
  • DC Load Bank - 200KW750VDC
DC Load Bank - 200KW750VDC
discuss personally
Model
LB-750/120
LB-750/150
LB-750/200
Basic info
Brand Wone
Model NO. DC Load Bank - 200KW750VDC
Rated voltage DC750V
Power 120KW
Series LB
Product Detail

Feature

  • It can reach the electrical parameters with high power (1kW to 10MW),high voltage ( AC 110V to 690V) or high current  (10000A or more).

  • According to the needs to design the load steps,configure intelligent digital display meter,all protections can  be configured optionally (Overheating alarm, Short circuit protection, Overheating protection, Fan overloading protection, Emergency stop button etc.).

  • In addition, our water-cooled load banks can also be equipped with cooling system and water tower.Customized solutions could be available upon request.


Load Bank  Structure


  •  When a single resistor can't meet load demand, multiple resistors are combined in series and parallel to increase power to meet the requirements.

  • The internal load resistors are circularly cooled by the axial fans.

  • The types of load built-in resistors are: high power wire wound resistors, aluminum housed resistors, high energy resistors, plate resistors, stainless steel resistors, high voltage resistors.

Notes

  • There shall be no flammable and explosive corrosive medium in the installation scope.

  • Connect the load and instrument power supply according to the identification on the equipment panel. After confirming that the voltage is normal, turn on the instrument power switch on the enclosure. At this time, all instruments display "0", all fans operate normally, and connect the load power supply .

  • To ensure safety, please do not touch the cabinet surface (except the panel) to prevent scalding.

  • After the load bank stops working, please delay 30 minutes to turn off the power supply of the fans, so as to avoid the accumulation of high temperature causing damage to other parts (such as instruments, switches, etc.)

  • There will be light smoke when the load is used for the first time,which is a normal phenomenon that silicone resin volatilizes when it meets high temperature medium.


Application Area

Generator test, power supply equipment, battery test, frequency converter, elevator, sub arc welding machine, lifting machinery, construction machinery, ship, rolling mill, wire drawing machine, centrifuge, UPS power supply, pulse load application, winch, generator, transformer, starting, braking, speed regulation and load test, as well as medical, railway, automobile, military and industrial control environment, etc.


Know your supplier
Wone
Main Categories
High voltage/Low voltage/Wire cable/Instrument meters/New energy/Tester/Production equipment/Generator/Electrical fittings/Integrated Electrical Equipment
Business Type
Design/Manufacture/Sales
Highest Annual Export (USD)
$50,000,000
Professional Experience
1 years
Workplace
65666m²m²
占位
占位
Related Products
Related Knowledges
What are the causes of failure of ferromagnetic voltage transformers in new energy power stations?
What are the causes of failure of ferromagnetic voltage transformers in new energy power stations?
By Felix, 15 Years in the Electrical IndustryHi everyone, I'm Felix, and I've been working in the electrical industry for 15 years.From early involvement in traditional substation commissioning and maintenance to now managing electrical system operations for multiple photovoltaic and wind power projects, one of the most frequently encountered devices I deal with is the Electromagnetic Voltage Transformer (PT).The other day, a shift operator at a new energy plant asked me:“We have an electr
Felix Spark
07/02/2025
In which directions will dry-type transformers develop in the future?
In which directions will dry-type transformers develop in the future?
By Echo, 12 Years in the Electrical IndustryHi everyone, I'm Echo, and I've been working in the electrical industry for 12 years.From my early days doing commissioning and maintenance in distribution rooms, to later participating in electrical system design and equipment selection for large-scale projects, I’ve witnessed how dry-type transformers have evolved from traditional tools into smarter, greener devices.Recently, a new colleague asked me:“What’s the current state of dry
Echo
07/02/2025
Installation and Commissioning of 10kV Dry-Type Transformers
Installation and Commissioning of 10kV Dry-Type Transformers
By James, 10 Years of Electrical Equipment Maintenance ExperienceHi everyone, I’m James, and I’ve been working in electrical equipment fault repair for 10 years.Over the past decade, I’ve worked in factories, substations, and distribution rooms of all sizes, involved in the installation, commissioning, maintenance, and troubleshooting of dry-type transformers. Dry-type transformers are among the most common electrical devices we deal with on a daily basis.Today, a new colleague
James
07/01/2025
What are the reasons for low insulation at the low-voltage side of a dry-type transformer?
What are the reasons for low insulation at the low-voltage side of a dry-type transformer?
Hi everyone, I’m Felix, and I’ve been working in electrical equipment fault repair for 15 years.Over these years, I’ve traveled across factories, substations, and distribution rooms all over the country, troubleshooting and repairing all kinds of electrical equipment. Dry-type transformers are among the most common devices we deal with.Today, a friend asked me:“What does it mean when the low-voltage side of a dry-type transformer has low insulation resistance?”Great
Felix Spark
07/01/2025
What tests are required for dry-type transformers?
What tests are required for dry-type transformers?
1 Pre - commissioning InspectionAs a front - line tester, before formally commissioning a dry - type transformer, I need to carry out a comprehensive and systematic inspection. First, I conduct a visual inspection of the transformer body and its accessories, carefully checking for mechanical damage or deformation. Then, I check whether the leads of the high - and low - voltage windings are firmly connected and whether the bolt tightening torque meets the standard requirements (usually 40 - 60N&m
Oliver Watts
07/01/2025
What aspects need attention during the installation of dry-type transformers?
What aspects need attention during the installation of dry-type transformers?
1 Pre - installation PreparationAs a front - line installer, I know very well that the preparation work before installing a dry - type transformer must be thorough. First, I will carefully review the design drawings and technical documents, and check one by one the technical parameters such as the model specification, rated capacity, and voltage level of the transformer to ensure they are in full compliance with the design requirements. Then, I will conduct an unpacking inspection of the transfo
James
07/01/2025
×
Inquiry
Download
Experts Electrical is dedicated to serving the personnel in the global power industry.
Join Experts Electrical, not only can you discover power equipment and power knowledge, but also canhnd like - minded friends!