• Counter For Surge Arrester for recording the operation times
  • Counter For Surge Arrester for recording the operation times
Counter For Surge Arrester for recording the operation times
discuss personally
Model
JSY-11S
Basic info
Brand Wone
Model NO. Counter For Surge Arrester for recording the operation times
Nominal Discharge Current 10kA
Residual Voltage not Exceeds 2kA
Series Arrester Auxiliary Equipment
Product Detail

Description:

JSY-11S surge arester counter is a device for recording the operation times of a lightning arrester under the lightning arrester connecting in series. It is applicable to lightning arrester with grade not exceeding 220KV. The environmental condition of using site is the same to the connecting lightning arresters. It is not applicable to places with heavy pollution and strenuous vibration. It applies zinc oxide varistor and has relative improvement on the electrical performance.

Using conditions:

  • It is applicable to exterior or interior.

  • Environmental temperature (-40 to +40) C . 

  • The altitude can't be over 2000m.

  • Supply frequency (48 to 62) Hz.

  • No place with strenuous vibration.

Structure and characteristic:

Electric Principle:

  • A discharge counter mainly consists of components like sampling varistor, silicon bridge rectifier, high-voltage condenser and electromagnetic counter, etc. The discharge current of lightning arrester generates voltage on the varistor (nonlinear resistance), and charges on condenser through silicon bridge rectifier and discharge to electromagnetic counter. The counter records every time it discharges, so as to realize the operation times of lightning arrester.

  •  The enclosure of this product applies premium stainless steel enclosure. It has good rot resistance and good sealing property, not being influenced by external environment. Inner components have good ageing resistance, which can run in the electric power system for long term.

JSY-11S lightning arrester discharge counter applies dual pointer display. The display has the advantages like clear display and easy observation, etc. The counting cycle index is from 0 to 999, which is to say 1000 times for a cycle. It is beneficial to record the times of lightning of going through the lightning arrester relatively completely in a short time.

Main Technical Properties:

Product implementing standard: JB/T 10492-2011 Monitoring Device for Metal Oxide Lightning Arrester. The main technical properties are as the below table:

image.png

Inspection and acceptance & installation:

 Inspection and Acceptance:

  •  When inspect and accept products, open the packing case and inspect whether the accompanying documents (operation manual,packing list and certificate of approval) are complete.

  •  Inspect whether the accessories are complete according to the packing list. Meanwhile, inspect whether the product appearance has scrape and whether the insulator has crack and dropped piece.

When installing, the dig angle between the plane of the panel of counter and the horizontal plane should be smaller than 85° , so as to avoid waterlogging influencing observation. Use M10 bolts to fix the metal enclosure base to the metal support and connect the ground through the ground bus. (The monitor base can also be the ground bus.) Another end connects the electrode through the top of the insulator and connects the low-pressure end of the lightning arrester by wire (or aluminum strip). It must install securely and contact reliably.(Installation dimension please see the attached drawing.)

Test methods:

When users receive products, they can use the below methods to test the products.

  • Operation Performance Test: Connect a condenser with withstand voltage over 500V and capacity over 5MFD to a 500V megger. Rotate the megger with the rotate speed of 90 to 120 per minute to charge the condenser. When the voltage of the condenser is monitored to be 300V by universal meter, disconnect the condenser connecting with the megger. Use the condenser to discharge the counter instantaneously and the discharge counter should count it as once. Perform it for 10 times consecutively and they should be reliable operations.

  • The test of discharge counter can also be performed by the specialized tester produced by our factory. For details please see Instruction of JCQT6000 Lightning Arrester Monitor Tester.

Precautions:

  • After putting the discharge counter into operation, operators on duty shall keep monitoring it and record the reading of the discharge counter regularly, so as to master the times of lightning current going through the lightning arrest.

  • Note to not overstress on the insulator to avoid destroying the sealing. Meanwhile, users can not take apart the lightning arrester discharge counter casually.

Quality assurance:

On the condition of user using and installing the product according to regulations, the company is responsible for the “Three Guarantees” after-sales service within the period of “Three Guarantees” . The period of “Three Guarantees” is a year. If user has special requirements, he can come and mail for negotiation.

image.png

Schematic Diagram of Structure and Installation

How does a surge arrester counter work?

When a surge current (such as overcurrent caused by lightning) passes through the surge arrester, the arrester operates to divert the surge current into the ground. At the same time, the current sensor in the connected surge arrester counter detects this current signal. The signal generated by the sensor is then converted and processed by the signal processing circuit. After processing, the signal triggers the counting unit to increment the count, causing the displayed number to increase by one, indicating that the arrester has performed one operation.

Know your supplier
Wone
Main Categories
High voltage/Low voltage/Wire cable/Instrument meters/New energy/Tester/Production equipment/Generator/Electrical fittings/Integrated Electrical Equipment
Business Type
Design/Manufacture/Sales
Highest Annual Export (USD)
$50,000,000
Professional Experience
1 years
Workplace
65666m²m²
占位
占位
Related Products
Related Knowledges
Research and Application of Prefabricated Enclosure Structure for High-Voltage Compartments in Substations
Research and Application of Prefabricated Enclosure Structure for High-Voltage Compartments in Substations
The economic development demands higher efficiency in substation construction, giving rise to prefabricated cabin substation technology. With modular design, equipment wiring, commissioning, and prefabrication are completed in factories, requiring only "building-block" assembly on-site. Take the 10kV prefabricated high-voltage room as an example: equipment and cabin are installed in the factory, with on-site work limited to busbar and cabin assembly. The main transformer incoming line connects v
Echo
06/14/2025
Modular Intelligent Substation - Prefabricated Secondary Switchgear Integration Assembly
Modular Intelligent Substation - Prefabricated Secondary Switchgear Integration Assembly
With the development of the national economy and society, the requirements for the quality and craftsmanship of power grid projects have become increasingly stringent. The need to improve the construction progress and quality of substations has created opportunities for the promotion of prefabricated cabin - type intelligent substations. The traditional on - site wiring and commissioning of secondary substation equipment involve a large amount of work. Moreover, on - site construction has to wai
Echo
06/13/2025
Application of Pre-integrated Prefabricated Substations in Renewable Energy Sector
Application of Pre-integrated Prefabricated Substations in Renewable Energy Sector
Against the backdrop of profound changes in the global energy landscape and the booming development of the new energy industry, the construction mode of traditional substations struggles to meet the rapid deployment needs of new energy projects. The modular intelligent prefabricated cabin substation, leveraging its innovative advantages, has become a key direction for optimizing the new energy power system. In - depth exploration of its technical principles, industry adaptability, and applicatio
Echo
06/13/2025
Research on Reliability Enhancement Scheme Implementation for Modular Intelligent Prefabricated Substations
Research on Reliability Enhancement Scheme Implementation for Modular Intelligent Prefabricated Substations
1 Implementation Strategies for the Scheme1.1 Deepen Survey and ResearchBefore constructing prefabricated cabin - type substations, it is necessary to conduct detailed surveys of local working conditions, clarify the construction scale and objectives, evaluate existing power facilities, plan projects, make up for infrastructure shortcomings, and adjust the construction rhythm. Meanwhile, control costs to avoid project suspension.1.2 Strengthen Structural ConstructionDuring promotion, multi - dim
Echo
06/13/2025
Comparative Analysis of 500 kV Prefabricated Substations vs. Conventional Substations
Comparative Analysis of 500 kV Prefabricated Substations vs. Conventional Substations
The secondary equipment area of conventional substations uses reinforced concrete or prefabricated steel structures, facing issues like long construction cycles, unreasonable functional zone design, strict environmental assessments, dust, noise, and disturbances. Primary and secondary equipment can only be installed after civil works and decoration, lowering construction efficiency.Prefabricated cabin substations integrate modularity, intelligence, and cost - effectiveness, boasting green, energ
Dyson
06/13/2025
Operational Analysis of Prefabricated Enclosure Substations in Extreme Cold Climate Applications
Operational Analysis of Prefabricated Enclosure Substations in Extreme Cold Climate Applications
Under global climate diversity, alpine power construction faces technical and environmental challenges. Extreme climates, complex geology, and long - term low winter temperatures, along with ice, snow, and storms, strain electrical equipment stability and power facility construction (schedule, cost, maintenance). Traditional on - site substations, with long construction and poor adaptability, can’t meet alpine regions’ fast, stable power needs.Prefabricated cabin substations, as modu
Echo
06/13/2025
×
Inquiry
Download
Experts Electrical is dedicated to serving the personnel in the global power industry.
Join Experts Electrical, not only can you discover power equipment and power knowledge, but also canhnd like - minded friends!
商品视频播放