Model
LW35-252/4000-50
LW35-252/3150-50
LW35-145/4000-50
LW35-145/3150-50
LW35-126/4000-50
LW35-126/3150-50
LW35-72.5/4000-63
LW35-72.5/3150-50
Basic info
Brand Wone
Model NO. 72.5KV 126KV 145KV 252KV SF6 Circuit Breaker
Rated voltage 72.5kV
Rated normal current 4000A
Series LW35
Product Detail

Description

LW35 serial circuit breakers, including LW35-72.5, LW35-126, LW35-145 and LW35-252 products, are designed with self-energizing principle that arc generated in the interrupter is distinguished at a specified time with a part of energy produced by the arc itself. They are used for making and breaking normal current, fault current and switching lines to realize the operation (three-pole opening & closing operation and fast automatic-reclosing operation),  control and protection of power system.


Main Features


  • Less consumption of SF6 gas, benefitial for environmental protection. When other kinds of circuit breaker at 0.6 MPa must be filled with SF6 of 27 kg/set, this kind of circuit breaker only need 19.3 kg/set.

  • Dynamic sealing system adopts advanced Glyd-ring and Step seal to reduce starting friction and prevent leakage.

  • Adopt imported control valve of stable performance and anti-slow-opening function in case of pressure loss.

  • Two sets of independent opening control circuit are adopted in hydraulic mechanism with two sets of relay protection to enhance service reliability.


Technical parameter:


LW35.png

What are the purity requirements for SF6 gas in the interrupter of a tank circuit breaker?

  • SF₆ Gas Purity: The purity of SF₆ gas is generally required to be 99.8% or higher. High-purity SF₆ gas ensures its excellent insulating and arc-quenching performance. The presence of impurities can reduce the insulation strength and arc-quenching capability of SF₆ gas. For example, contaminants such as moisture and air can affect the ionization process and the cooling effect of the arc.

  • Toxic and Harmful Substances: When SF₆ gas contains a significant amount of impurities, it may produce more toxic and harmful substances under the influence of the arc, posing greater risks to both equipment and human health.


Know your supplier
Wone
Main Categories
High voltage/Low voltage/Wire cable/Instrument meters/New energy/Tester/Production equipment/Generator/Electrical fittings/Integrated Electrical Equipment
Business Type
Design/Manufacture/Sales
Highest Annual Export (USD)
$50,000,000
Professional Experience
1 years
Workplace
65666m²m²
占位
占位
Related Products
Related Knowledges
Modular Intelligent Substation - Prefabricated Secondary Switchgear Integration Assembly
Modular Intelligent Substation - Prefabricated Secondary Switchgear Integration Assembly
With the development of the national economy and society, the requirements for the quality and craftsmanship of power grid projects have become increasingly stringent. The need to improve the construction progress and quality of substations has created opportunities for the promotion of prefabricated cabin - type intelligent substations. The traditional on - site wiring and commissioning of secondary substation equipment involve a large amount of work. Moreover, on - site construction has to wai
Echo
06/13/2025
Application of Pre-integrated Prefabricated Substations in Renewable Energy Sector
Application of Pre-integrated Prefabricated Substations in Renewable Energy Sector
Against the backdrop of profound changes in the global energy landscape and the booming development of the new energy industry, the construction mode of traditional substations struggles to meet the rapid deployment needs of new energy projects. The modular intelligent prefabricated cabin substation, leveraging its innovative advantages, has become a key direction for optimizing the new energy power system. In - depth exploration of its technical principles, industry adaptability, and applicatio
Echo
06/13/2025
Research on Reliability Enhancement Scheme Implementation for Modular Intelligent Prefabricated Substations
Research on Reliability Enhancement Scheme Implementation for Modular Intelligent Prefabricated Substations
1 Implementation Strategies for the Scheme1.1 Deepen Survey and ResearchBefore constructing prefabricated cabin - type substations, it is necessary to conduct detailed surveys of local working conditions, clarify the construction scale and objectives, evaluate existing power facilities, plan projects, make up for infrastructure shortcomings, and adjust the construction rhythm. Meanwhile, control costs to avoid project suspension.1.2 Strengthen Structural ConstructionDuring promotion, multi - dim
Echo
06/13/2025
Comparative Analysis of 500 kV Prefabricated Substations vs. Conventional Substations
Comparative Analysis of 500 kV Prefabricated Substations vs. Conventional Substations
The secondary equipment area of conventional substations uses reinforced concrete or prefabricated steel structures, facing issues like long construction cycles, unreasonable functional zone design, strict environmental assessments, dust, noise, and disturbances. Primary and secondary equipment can only be installed after civil works and decoration, lowering construction efficiency.Prefabricated cabin substations integrate modularity, intelligence, and cost - effectiveness, boasting green, energ
Dyson
06/13/2025
Operational Analysis of Prefabricated Enclosure Substations in Extreme Cold Climate Applications
Operational Analysis of Prefabricated Enclosure Substations in Extreme Cold Climate Applications
Under global climate diversity, alpine power construction faces technical and environmental challenges. Extreme climates, complex geology, and long - term low winter temperatures, along with ice, snow, and storms, strain electrical equipment stability and power facility construction (schedule, cost, maintenance). Traditional on - site substations, with long construction and poor adaptability, can’t meet alpine regions’ fast, stable power needs.Prefabricated cabin substations, as modu
Echo
06/13/2025
Implementation of Precast Foundations for Ring-Main Unit Compact Substations in Grid Modernization Initiatives
Implementation of Precast Foundations for Ring-Main Unit Compact Substations in Grid Modernization Initiatives
Compact substation boxes, with advantages like safe operation, high reliability, and easy maintenance, are used in urban grid construction/renovation. Structurally divided into American - style (high - cost, noisy, low - efficiency, gradually phased out) and European - style (large - sized but more advantages, still popular).To address their pros/cons, ring - network prefabricated ones were developed.I. Basic Materials for Prefabricated Compact Substation BoxesMaterials need hardness, strength,
Echo
06/13/2025
×
Inquiry
Download
Experts Electrical is dedicated to serving the personnel in the global power industry.
Join Experts Electrical, not only can you discover power equipment and power knowledge, but also canhnd like - minded friends!
商品视频播放