
1.Why Choose Rockwill?
1.1 Technological Leadership, Tailored for Brazil’s Complex Needs
- Hiqgh-Reliability Design:
- Adapted to Brazil’s diverse terrain (e.g., Amazon rainforests, plateaus) and extreme weather (high temperatures, heavy rainfall) with containerized structure and IP65 protection grade.
- Utilizes gas-filled cabinet technology to ensure stable operation in humid and dusty environments.
- Smart O&M:
- Integrated remote monitoring system for real-time tracking of voltage, current, and temperature, enabling fault alerts and automatic adjustments to reduce manual maintenance costs.
- Modular Rapid Deployment:
- Prefabricated design shortens construction cycles by 50%, supporting rapid grid connection for distributed PV plants and aligning with Brazil’s 2024 target of 10.8GW new PV capacity.
1.2 Localized Services, Minimizing Risks
- Localized Production & Supply Chain:
- Collaborates with Brazilian partners to establish assembly centers, reducing delivery timelines.
- Customized Solutions:
- Flexible configurations (e.g., dual-split structure, energy storage interfaces) for diverse applications, including rooftop and centralized PV plants.
- Policy Compliance:
- Expertise in INMETRO certification standards, environmental regulations, and Brazil’s Renewable Energy Generation Program.
2.Brazilian Market Challenges & Rockwill Solutions
Challenges
- High tariffs and logistics costs.
- Grid instability leading to power fluctuations.
- Frequent natural disasters (hurricanes, floods) threatening equipment.
- High construction costs for distributed projects in remote areas.
Solutions
- Localized assembly to reduce import tariffs; split-type packaging design optimizes transport space and costs.
- Dual-split structure enhances fault tolerance; intelligent systems enable seamless grid integration and energy storage synergy.
- Anti-seismic (Grade 8) and wind-resistant (≥Grade 12) equipment to withstand harsh environments.
- Modular design simplifies deployment in remote areas, lowering construction complexity and costs.
3.Success Cases
- Brazilian PV Project
- Supplied 19 prefabricated substations, achieving maintenance-free operation and 12% annual efficiency improvement.

- South American Solar-Storage Hybrid Project
- Integrated 610W rectangular modules + energy storage interfaces, reducing BOS costs by 15% and boosting revenue by 20%.
- Amazon Rainforest Off-Grid Power Supply
- Provided modular substations for 10 remote communities, enabling 100% off-grid operation.
4.Why Act Now?
- Policy Window: Brazil aims to exceed 100GW PV capacity by 2030, with adjustments to distributed generation subsidies in 2025.
- Cost Advantage: Localized production reduces costs by 18% compared to imported equipment.
Rockwill — Partnering with Brazil’s Clean Energy Future. Empowering Every Kilowatt!