• DEM2D Series Din-Rail 75mV DC Meter accordance with CE
  • DEM2D Series Din-Rail 75mV DC Meter accordance with CE
  • DEM2D Series Din-Rail 75mV DC Meter accordance with CE
DEM2D Series Din-Rail 75mV DC Meter accordance with CE
$60.00
Model
DCM-2000-
Basic info
Brand Wone
Model NO. DEM2D Series Din-Rail 75mV DC Meter accordance with CE
Rated voltage DC1kv
Rated normal current 2000A
Rated frequency 50(Hz)
Methods of Communication RS485
Series DEM2D003
Product Detail

Description

It adopts a standard 75mV design, and configures the shunt of the corresponding specification according to the actual current in the field for measurement, and has a wide range of applications. RS485 communication, support Modbus protocol and DLT645 protocol, baud rate 9600bps, can use data centralized meter reading, equipment docking and parameter setting.

Features

  • RS485 communication: used for parameter setting, data reading; DTL645 protocol/Modbus Protocol.

  • DC metering: using shunt sampling, high measurement accuracy; can measure DC power, current, voltage.

  • Alarm function: Over-current alarm: When the current exceeds the CT1 value set by the meter, an alarm event occurs, and the alarm light on the electrical surface panel lights up (yellow light).

  • At the same time, the value of the corresponding alarm status register will change, and the user can read this register through communication to determine whether an over-current alarm has occurred.

  • Display: LCD with backlight ,Support Various parameters display,energy data and Instantaneous parameters.

  • Firmware upgrade: RS485 local upgrade.

Specifications

Main
Range DEM2D003
Product or Componet Type Energy meter
Country of origin China
Complementary
Phase Single Phase
Type of measurement

-----

Metering type

Measurement

Device Application

Energy Charge

Accuracy class Active power 1.0 
Rated Current

2000A

Rated Voltage

DC 5V~1000V

Network Frequency 50-60Hz
Technology Type Electronic
Display Type LCD display(LCD 6+2 = 999999.99kWh)
Impulse Constant

According to 1000imp/kWh,

Maximum value measured 99999.99kWh
Tariff input ----
Communication port protocol Modbus and DLT645
Communication port support RS485 
Local signalling

------

Number of inputs -------
Number of Outputs --------------
Output voltage -----
Mounting Mode Clip-on
Mounting Support DIN rail
Connections - terminals

-------

Standards

CE



Environment
IP degree of protection

IP54

Relative humidity ≤95%
Ambient air temperature for operation 25…70 °C
Ambient Air Temperature for Storage 25…70 °C
Operating altitude ---
Dimensions 73mm*36mm*90mm
Packing Units
Unit Type of Package 1 PCE
Number of Units in Package 1 1
Package 1 Height 92mm
Package 1 Width 38mm
Package 1 Length 75mm
Package 1 Weight 1.000kg



Connection Diagram

image.png


Dimensions

image.png






Know your supplier
Wone
Main Categories
High voltage/Low voltage/Wire cable/Instrument meters/New energy/Tester/Production equipment/Generator/Electrical fittings/Integrated Electrical Equipment
Business Type
Design/Manufacture/Sales
Highest Annual Export (USD)
$50,000,000
Professional Experience
1 years
Workplace
65666m²m²
占位
占位
Related Products
Related Knowledges
Application of Pre-integrated Prefabricated Substations in Renewable Energy Sector
Application of Pre-integrated Prefabricated Substations in Renewable Energy Sector
Against the backdrop of profound changes in the global energy landscape and the booming development of the new energy industry, the construction mode of traditional substations struggles to meet the rapid deployment needs of new energy projects. The modular intelligent prefabricated cabin substation, leveraging its innovative advantages, has become a key direction for optimizing the new energy power system. In - depth exploration of its technical principles, industry adaptability, and applicatio
Echo
06/13/2025
Research on Reliability Enhancement Scheme Implementation for Modular Intelligent Prefabricated Substations
Research on Reliability Enhancement Scheme Implementation for Modular Intelligent Prefabricated Substations
1 Implementation Strategies for the Scheme1.1 Deepen Survey and ResearchBefore constructing prefabricated cabin - type substations, it is necessary to conduct detailed surveys of local working conditions, clarify the construction scale and objectives, evaluate existing power facilities, plan projects, make up for infrastructure shortcomings, and adjust the construction rhythm. Meanwhile, control costs to avoid project suspension.1.2 Strengthen Structural ConstructionDuring promotion, multi - dim
Echo
06/13/2025
Comparative Analysis of 500 kV Prefabricated Substations vs. Conventional Substations
Comparative Analysis of 500 kV Prefabricated Substations vs. Conventional Substations
The secondary equipment area of conventional substations uses reinforced concrete or prefabricated steel structures, facing issues like long construction cycles, unreasonable functional zone design, strict environmental assessments, dust, noise, and disturbances. Primary and secondary equipment can only be installed after civil works and decoration, lowering construction efficiency.Prefabricated cabin substations integrate modularity, intelligence, and cost - effectiveness, boasting green, energ
Dyson
06/13/2025
Operational Analysis of Prefabricated Enclosure Substations in Extreme Cold Climate Applications
Operational Analysis of Prefabricated Enclosure Substations in Extreme Cold Climate Applications
Under global climate diversity, alpine power construction faces technical and environmental challenges. Extreme climates, complex geology, and long - term low winter temperatures, along with ice, snow, and storms, strain electrical equipment stability and power facility construction (schedule, cost, maintenance). Traditional on - site substations, with long construction and poor adaptability, can’t meet alpine regions’ fast, stable power needs.Prefabricated cabin substations, as modu
Echo
06/13/2025
Implementation of Precast Foundations for Ring-Main Unit Compact Substations in Grid Modernization Initiatives
Implementation of Precast Foundations for Ring-Main Unit Compact Substations in Grid Modernization Initiatives
Compact substation boxes, with advantages like safe operation, high reliability, and easy maintenance, are used in urban grid construction/renovation. Structurally divided into American - style (high - cost, noisy, low - efficiency, gradually phased out) and European - style (large - sized but more advantages, still popular).To address their pros/cons, ring - network prefabricated ones were developed.I. Basic Materials for Prefabricated Compact Substation BoxesMaterials need hardness, strength,
Echo
06/13/2025
The design of the three-purpose grounding transformer
The design of the three-purpose grounding transformer
Underground Power Cable Transmission LinesDirect - buried power cable lines have large ground - distributed capacitance, causing high single - phase - to - ground short - circuit capacitive current. For 10 kV lines, if this current exceeds 10 A, arcs hardly self - extinguish, risking arc overvoltage and endangering line equipment. Arc extinction is thus necessary. With a Dyn - connected main transformer, an arc - suppression coil on the secondary neutral point suffices. For Yd - connected ones,
Dyson
06/12/2025
×
Inquiry
Download
Experts Electrical is dedicated to serving the personnel in the global power industry.
Join Experts Electrical, not only can you discover power equipment and power knowledge, but also canhnd like - minded friends!
商品视频播放