• 530 W - 555 W Bificial High Power Dual cell PERC Module(Mono)
  • 530 W - 555 W Bificial High Power Dual cell PERC Module(Mono)
530 W - 555 W Bificial High Power Dual cell PERC Module(Mono)
discuss personally
Model
WN6W-555MB-AG
WN6W-530MB-AG
Basic info
Brand POWERTECH
Model NO. 530 W - 555 W Bificial High Power Dual cell PERC Module(Mono)
Power Bifaciality 70%
Max. System Voltage 1500V (IEC)
Max. Series Fuse Rating 30A
Module Fire Performance CLASS C
Max. power of the module 555W
Max. efficiency of Module 21.5%
Series Bificial MONO PERC
Product Detail

Features

  • Module power up to 555 W Module efficiency up to 21.5 %.

  • Up to 12.3 % lower LCOE Up to 5.2 % lower system cost.

  • Comprehensive LID / LeTID mitigation technology, up to 50% lower degradation.

  • Compatible with mainstream trackers, cost effective product for utility power plant.

  • Better shading tolerance.

Standard

  • Minimizes micro-crack impact.

  • Heavy snow load up to 5400 Pa, wind load up to 2400 Pa*.

Engineering drawing(mm)

image.png

CS6W-530MB-AG / I-V gurves

image.png

Electrical date/STC*

image.png

Electrical date/NMOT*

image.png

Electrical date

image.png

Mechanical charactheristics

image.png

Temperature characteristics

image.png

How does PERC work?

Definition:
PERC technology is a design improvement technology for photovoltaic cells, aiming to enhance the overall photoelectric conversion efficiency of the cells by reducing recombination losses on the back surface and improving back surface reflection.

Working Principle:

  • Passivation: By adding a dielectric passivation layer (such as aluminum oxide Al2O3 or silicon nitride SiN) on the back of the cell, the recombination losses on the back surface are reduced, that is, the non-radiative recombination of photogenerated carriers on the back surface is decreased.

  • Reflection: The passivation layer also has a high reflectivity, which can reflect the unabsorbed light back into the cell, increasing the absorption probability of photons and thereby enhancing the short-circuit current (Is).

  • Hole-opening: Holes are opened on the passivation layer (by means of lasers, etc.) to form metal contact points for current collection.

Know your supplier
POWERTECH
We are an electrical company that manufactures and sells high and low voltage electrical products.
Main Categories
High voltage
Business Type
Design/Manufacture/Sales
Highest Annual Export (USD)
$120000000
Professional Experience
7 years
Workplace
580000m²
占位
占位
Related Knowledges
Application of Pre-integrated Prefabricated Substations in Renewable Energy Sector
Application of Pre-integrated Prefabricated Substations in Renewable Energy Sector
Against the backdrop of profound changes in the global energy landscape and the booming development of the new energy industry, the construction mode of traditional substations struggles to meet the rapid deployment needs of new energy projects. The modular intelligent prefabricated cabin substation, leveraging its innovative advantages, has become a key direction for optimizing the new energy power system. In - depth exploration of its technical principles, industry adaptability, and applicatio
Echo
06/13/2025
Research on Reliability Enhancement Scheme Implementation for Modular Intelligent Prefabricated Substations
Research on Reliability Enhancement Scheme Implementation for Modular Intelligent Prefabricated Substations
1 Implementation Strategies for the Scheme1.1 Deepen Survey and ResearchBefore constructing prefabricated cabin - type substations, it is necessary to conduct detailed surveys of local working conditions, clarify the construction scale and objectives, evaluate existing power facilities, plan projects, make up for infrastructure shortcomings, and adjust the construction rhythm. Meanwhile, control costs to avoid project suspension.1.2 Strengthen Structural ConstructionDuring promotion, multi - dim
Echo
06/13/2025
Comparative Analysis of 500 kV Prefabricated Substations vs. Conventional Substations
Comparative Analysis of 500 kV Prefabricated Substations vs. Conventional Substations
The secondary equipment area of conventional substations uses reinforced concrete or prefabricated steel structures, facing issues like long construction cycles, unreasonable functional zone design, strict environmental assessments, dust, noise, and disturbances. Primary and secondary equipment can only be installed after civil works and decoration, lowering construction efficiency.Prefabricated cabin substations integrate modularity, intelligence, and cost - effectiveness, boasting green, energ
Dyson
06/13/2025
Operational Analysis of Prefabricated Enclosure Substations in Extreme Cold Climate Applications
Operational Analysis of Prefabricated Enclosure Substations in Extreme Cold Climate Applications
Under global climate diversity, alpine power construction faces technical and environmental challenges. Extreme climates, complex geology, and long - term low winter temperatures, along with ice, snow, and storms, strain electrical equipment stability and power facility construction (schedule, cost, maintenance). Traditional on - site substations, with long construction and poor adaptability, can’t meet alpine regions’ fast, stable power needs.Prefabricated cabin substations, as modu
Echo
06/13/2025
Implementation of Precast Foundations for Ring-Main Unit Compact Substations in Grid Modernization Initiatives
Implementation of Precast Foundations for Ring-Main Unit Compact Substations in Grid Modernization Initiatives
Compact substation boxes, with advantages like safe operation, high reliability, and easy maintenance, are used in urban grid construction/renovation. Structurally divided into American - style (high - cost, noisy, low - efficiency, gradually phased out) and European - style (large - sized but more advantages, still popular).To address their pros/cons, ring - network prefabricated ones were developed.I. Basic Materials for Prefabricated Compact Substation BoxesMaterials need hardness, strength,
Echo
06/13/2025
The design of the three-purpose grounding transformer
The design of the three-purpose grounding transformer
Underground Power Cable Transmission LinesDirect - buried power cable lines have large ground - distributed capacitance, causing high single - phase - to - ground short - circuit capacitive current. For 10 kV lines, if this current exceeds 10 A, arcs hardly self - extinguish, risking arc overvoltage and endangering line equipment. Arc extinction is thus necessary. With a Dyn - connected main transformer, an arc - suppression coil on the secondary neutral point suffices. For Yd - connected ones,
Dyson
06/12/2025
×
Inquiry
Download
Experts Electrical is dedicated to serving the personnel in the global power industry.
Join Experts Electrical, not only can you discover power equipment and power knowledge, but also canhnd like - minded friends!
商品视频播放